1.4. Electrical Department<br />

1.4.1. MOHAMMAD BAKHSHI<br />

Education: Azad Islamic University,Power Electrical Engineering<br />

Graduation Date: September 1995<br />

Working Experience:<br />

� 1999 -2001 Niroo Va Tavan<br />

� (Production management of maintanance of electrical equipment)<br />

� 2002 Zolal Iran Co.<br />

� 2003-2007 Andisheh Zolal<br />

� 2007-2010 Bina Consulting engineering<br />

� I have been envolved in Electrical Equipment Installation .<br />

Working Projects:<br />

� Montazer ghaem combined cycle power plant<br />

� Kerman Combined Cycle Pawer plant<br />

� Fajr Petrochemical Plant-mahshahr Iran.<br />

� Darquain Water Treatment Plant and Water Transfer Pipeline<br />

� Basrah refinery Wastewater Treatment Plant<br />

1.4.2. ANITA LAHOUTI<br />

Education: Azad Tafresh University, Electronic Engineering B.S.<br />

Graduation Date: 2010<br />

Working Experiences:<br />

� 2010 Up to now Darya Petro Sazeh<br />

Working Projects:<br />

� DARQUAIN OIL FIELD WATER TREATMENT PROJECT<br />

� SYRIAN ARAB REPUBLIC( LATAKIA) SEWAGE TREATMENT<br />

PLANT<br />

� SYRIAN ARAB REPUBLIC(TARTOUS) SEWAGE TREATMENT<br />

PLANT<br />

� SOUTH PARS GAS FIELD DEVELOPMENT PHASE 12 SEWAGE<br />

TREATMENT PACKAGE(2000)<br />

� SOUTH PARS GAS FIELD DEVELOPMENT PHASE 12 SEWAGE<br />

TREATMENT PACKAGE(6000)