10.07.2015 Views

Mandatory Disclosure for 2009-2010 - babasaheb naik college of ...

Mandatory Disclosure for 2009-2010 - babasaheb naik college of ...

Mandatory Disclosure for 2009-2010 - babasaheb naik college of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Computer Sicence & Engineering<strong>2009</strong>-10 2008-09 2007-08Cut <strong>of</strong>f / last candidate admitted 138 151 240Fees in rupees 56090 58400 47520Number <strong>of</strong> Fee Waivers <strong>of</strong>fered Nil 10 4Admission CalendarAs per DTE Mumbai.PIO quotaNAIn<strong>for</strong>mation Technology<strong>2009</strong>-10 2008-09 2007-08Cut <strong>of</strong>f / last candidate admitted 135 138 154Fees in rupees 56090 58400 47520Number <strong>of</strong> Fee Waivers <strong>of</strong>fered Nil 4 NilAdmission CalendarPIO quotaCommon <strong>for</strong> all branchesNA15 Infrastructural in<strong>for</strong>mation^Total 31 Class Room and Tutorial Halls (3192.5Classroom/Tutorial Room facilitiesSq.M), 2 Drawing Halls (317.84 Sq.M.).Refer (Page No. M-76)Laboratory details See Appendix-IV (Page No.M-68,75 )Refer (Page No. M-77,78)• Number and Configuration <strong>of</strong> Systems –504 (P-IV & Above)• Total number <strong>of</strong> systems connected byLAN/WAN – 504• Hi-End Servers : HP DL380 G5, HPComputer Centre facilitiesML150, IBM AS/400, HCL Magnum. HPML 110, Sonicwall Firewall.• Internet bandwidth – 1.5 Mbps (512 KbpsBSNL Broadband)• Leased Line Internet : 1 Mbps RelianceCommunicationBabasaheb Naik College <strong>of</strong> Engineering, Pusad(<strong>Mandatory</strong> <strong>Disclosure</strong> <strong>2010</strong>) M‐15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!