10.07.2015 Views

Page 1 of 1 - Central Bureau of Investigation

Page 1 of 1 - Central Bureau of Investigation

Page 1 of 1 - Central Bureau of Investigation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

) While selecting the site, it should be ensured that land isnot waterlogged and is suitable for construction <strong>of</strong>building. Efforts should be made to select the sitewhich is centrally located and is convenient for CBIpersonnel.c) Offer <strong>of</strong> the landlord/Government with cost <strong>of</strong> land is tobe collected.d) It is to be ensured that identified land is free from anydispute.e) Preference is to be given for purchase <strong>of</strong> land from thegovernment agencies like CPWD/StateGovernment/PSU, etc.f) The price <strong>of</strong> land is to be got assessed/verified by theCPWD inter alia reasonableness <strong>of</strong> cost <strong>of</strong> land -certificate is to be obtained from CPWD.g) Draft Committee on Non-plan Expenditure Note (CNE) isto be sent alongwith the proposal if the total cost <strong>of</strong> landand building is Rs.5 crores and above.h) The proposal is required to be routed through RegionalOffice and Zonal Joint Director.29.5 Once site for construction <strong>of</strong> <strong>of</strong>fice is purchased, further actionfor construction <strong>of</strong> building is to be taken by the branch withoutdelay. CPWD is to be requested for preparation <strong>of</strong> architecturaldesign, drawings and preliminary estimate for the <strong>of</strong>fice/quartersproposed for construction. While request is being made to CPWD, therequirement calculated as per the guidelines given above should beinformed to the CPWD so that the requirement and the plan are inorder. The proposal duly approved by the DIG and JD concernedmust be sent to the Head Office. After the approval <strong>of</strong> Director, CBI,the proposal is sent to the government for sanction.29.6 For hiring the building on rent for <strong>of</strong>fice purposes, effortsshould be made to locate government owned/PSU/semi-governmentbuilding. Where it is not available, private accommodation is to behired. For this purpose, as per CVC guidelines 55[1] , it is mandatory togive wide publicity through local newspapers wherever the monthlyrent <strong>of</strong> building is likely to be above Rs.60,000. On receipt <strong>of</strong> tenders55[1] OM No.5DD-6-CTE-5 dated 8.9.1999<strong>Page</strong> 201 <strong>of</strong> 201

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!