10.07.2015 Views

Page 1 of 1 - Central Bureau of Investigation

Page 1 of 1 - Central Bureau of Investigation

Page 1 of 1 - Central Bureau of Investigation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

29. ACCOMMODATION29.1 The requirement <strong>of</strong> space for establishing CBI branch at aparticular station is to be met from any <strong>of</strong> the following sources:i) Allotment <strong>of</strong> government accommodation through StateGovernment or Directorate <strong>of</strong> Estates (CPWD).ii)Accommodation owned by CBI.iii) Hiring <strong>of</strong> accommodation from Public SectorUndertaking/Any other government agency/private.29.2 The requirement <strong>of</strong> space for accommodating a CBI branch isto be assessed keeping in view the guidelines <strong>of</strong> Directorate <strong>of</strong> Estates,operational requirements <strong>of</strong> CBI and special requirements <strong>of</strong> thebranch. Directorate <strong>of</strong> Estates has formulated guidelines forcalculating the requirement <strong>of</strong> conventional and non-conventionalspace in the <strong>of</strong>fice building vide its OM No.11015/15/98-Pol.I dated7.8.1998, annexed as Annexure-XIV. The strength <strong>of</strong> the branch istaken into consideration for assessing the conventional spacerequirement. Further, guidelines regarding future requirement andausterity cuts are also to be taken into consideration.29.3 Specific approval <strong>of</strong> Cabinet Secretariat is not required forgetting <strong>of</strong>fice accommodation from Directorate <strong>of</strong> Estates. However,before sending any requisition to such authority, a detailed proposalwith justification <strong>of</strong> requirement <strong>of</strong> the building/space should be sentto the Head Office for obtaining the approval <strong>of</strong> the Director/CBI. Nospace is to be taken from any other agency except with the priorapproval <strong>of</strong> Director/CBI.29.4 For CBI branch to have its own <strong>of</strong>fice building, purchase <strong>of</strong>land/ready-built building from state government/private agency/PSUis required. Any purchase <strong>of</strong> land or a building requires the specificapproval and sanction <strong>of</strong> the Government. For getting the approvalfrom the Government, a detailed proposal with full justification is tobe prepared as per the following guidelines:a) Requirement <strong>of</strong> land is to be assessed based on the <strong>of</strong>ficespace requirements (both conventional and nonconventionalas per norms fixed by the Directorate <strong>of</strong>Estates) and in consultation with CPWD.<strong>Page</strong> 200 <strong>of</strong> 200

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!