10.07.2015 Views

Coastal flood risk management strategy, Pegwell Bay to Kingsdown

Coastal flood risk management strategy, Pegwell Bay to Kingsdown

Coastal flood risk management strategy, Pegwell Bay to Kingsdown

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Reach 9: S<strong>to</strong>ur ValleyAlong the River S<strong>to</strong>ur <strong>flood</strong>protection is predominantlyprovided by earthembankments, apart from thefrontage immediately north ofRichborough Castle whereground levels provideadequate protection againsttidal <strong>flood</strong>ing.The land on both banks isconsidered <strong>to</strong> be good <strong>to</strong> verygood grade agricultural land.Flooding in this reach isdominated by fluvial processes.Therefore the long-termstrategic <strong>management</strong> of thisarea will be determined in theforthcoming Lower S<strong>to</strong>ur River<strong>strategy</strong>. The option identifiedin this <strong>Pegwell</strong> <strong>Bay</strong> <strong>to</strong>Flooding 2001<strong>Kingsdown</strong> coastal <strong>strategy</strong> isa ‘holding’ option untilcompletion and adoption ofthe Lower S<strong>to</strong>ur River <strong>strategy</strong>.The preferred policy from theCatchment Flood ManagementPlan (CFMP) for this reach is<strong>to</strong> ‘Take action <strong>to</strong> increasefrequency of <strong>flood</strong>ing <strong>to</strong> bringbenefits elsewhere’.Strategic optionDo nothingDo minimumActionsNo further work will be undertaken on the existing defencesThe condition of the existing defences would be moni<strong>to</strong>red and any damagerepaired on a reactive basisDo minimum has been selected as a holding option until completion of the Lower S<strong>to</strong>ur River<strong>strategy</strong>. It is anticipated that managed realignment will be the preferred option in this reach <strong>to</strong>reduce <strong>flood</strong> <strong>risk</strong> <strong>to</strong> Canterbury. The viability and extent of this managed realignment will bedetermined by the Lower S<strong>to</strong>ur River Strategy.16 Environment Agency <strong>Pegwell</strong> <strong>Bay</strong> <strong>to</strong> <strong>Kingsdown</strong> coastal <strong>strategy</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!