<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTS2AEarthworkMaterials1. Shovel, Pointed pc P P2. Shovel, Flat pc P P3. 2"x2"x12' Rough lumber pc P PLabor1. Staking mh P P2. Excavation mh P P3. Backfilling mh P PMaterial CostPLaborPSub-Total for Item S2APS2A.1 FencingMaterials1. Plastic cover (sako), 6ft height m P P2. 2" x 2" x 12' rough lumber, for post and bracing pc P Pon plastic cover3. 2" Common wire nail kg P P4. 3" Common wire nail kg P PLabor1. Skilled mh P P1. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S2A.1PPPS2BRemoval and DisposalMaterials1. 24" Claw bar pc P PLabor1. Removal of existing floor tiles and wall tiles at Toilets mh P P2. Removal of existing counters, water closets, cabinets, mh P Pfixtures and fittings3. Removal of existing ceiling, boards and runners/ mh P Phangers, ceiling nailers and hangers4. Removal of drywall partitions, modular partition mh P Pbaseboard and cornice5. Removal of existing doors and jambs mh P P6. Removal of existing vinyl tiles and carpet tiles mh P P7. Chipping and removal of existing concrete wall & floor mh P P8. Removal of existing sliding window (Internal Audit) mh P Pand fixed window (Lobby)9. Removal of existing Roofing (concrete/metal) mh P P10. Hauling and disposal of excess materials/debris mh P Pat designated dumping site.


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTNote: (Verify Plan or Coordinate to assigned Engineeror Architect on site the extent of the removal works.)S2B.1 Removal and RelocationLabor1. Removal and relocation of all tables, cabinets, files mh P Pand chairsEquipment:1. ELF Truck day P P2. Portable Jack Hammer day P PNote: (Verify Plan or Coordinate to assigned Engineeror Architect on site the extent of the removal works.)Material CostLabor CostEquipment CostSub-Total for Item S2BPPPPS2CTermite Control (Interior/Exterior)Materials:1. Termite Treatment Chemical (Low Odor) ltr P P2. Paint Brush 3" pc P P3. Paint Brush 4" pc P P4. Roller Brush w/ Handle 7" pc P P5. Stopa Rug kg P PEquipment Rental1. Power Spayer Rental day P PLabor:1. Pest Specialist mh P P2. Helper mh P PMaterial CostLabor CostEquipment CostSub-Total for Item S2CPPPPD3MATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D2OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D2CONCRETES3A Cast-In-Place ConcreteS3A.1 Floor slab at Internal Audit Department,PPPPPPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTMaterials1. 4" thk. Machine Made Concrete Hollow Block pc P P2. Portland Cement Type I (40 kg./bag) bag P P3. River Washed Sand cu.m. P P4. 10mm dia. x 6.00 M Reinforcing Steel Bar pc P P5. # 16 G.I. Tie Wire kg P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S4A.1PPPD5MATERIAL COSTLABOR COSTEQUIPMENT COSTPDIRECT COST FOR ITEM D4POCM (_____%)PPROFIT (_____%)PCONTRACTOR'S TAX (2%)PTOTAL COST FOR ITEM D4PMETALSS5A Miscellaneous MetalsS5A.1 Stair Railing at BOD-EntranceMaterials1. 1.2mm. Thk. 2 ½ "dia.x6.0m Stainless Steel (10ft.) pc P P2. 1.2mm. Thk. 1 ½ "dia.x6.0m Stainless Steel (10ft.) pc P PPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT3. Welding Rod (Stainless) kg P P4. 4" dia. Grinder Disk pc P P5. Stainless steel floor flange/cover flange and screw 2 set P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S5A.1PPPS5A.2Counter Frames at BOD-Toilet, VP-Finance Toilet,Public Toilets (Ladies/Gent's)Materials1. 3/16" thk. x 2" x 2" x 6.0m Angular Bar pc P P2. 3/8" dia. x 3" long expansion bolt w/ shield and washer pc P P3. Welding Rod kg P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S5A.2PPPS5A.3Stainless Steel Logo and LettersMain Lobby (Waterscape)(Supply and Install)Materials1. Stainless Steel Logo & Letters w/ mounting accessories 1 set P PNote: Finish and Quality of materials is subject forApproval of the Designing Architect or EngineerS5BMaterial CostSub-Total for Item S5A.3Structural Steel WorkS5B.1 Steel Truss at Internal Audit Dept., Finance Dept.,COA-Stock/Filing Room, (Roof Extension)Materials1. 1/4"x2 ½"x2 ½" Angular Bar (Top chord, Bottom chord) pc P P2. 1/4" x 2" x 2" Angular Bar (Members) pc P P3. 1.5mm x 2" x 5" C-Purlins pc P PPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT4. 12mm dia. Plain bar 6.0m long(Sag rod) pc P P5. Welding Rod kls. P P6. 4" dia. Grinder disk pc P PEquipment Rental1. Welding Machine day P P2. Oxy-Acetylene Tank & Fittings day P P3. Scaffolding (H-Frame and other accessories) set P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostPLabor CostPEquipment Rental CostPSub-Total for Item S5B.1PS5B.2 Entrance Canopy at BOD-AreaMaterials1. 2.0mm. x 2" x 6" x 6.0m.Tubular Bar pc P P2. 1 1/2" dia. B.I.Pipe (20ft.) "Schedule 40" pc P P3. 1" dia. B.I.Pipe (20ft.) "Schedule 40" pc P P4. 3/16" x 1" x 6.0m. Flat Bar pc P P5. Welding Rod kls. P P6. Hacksaw Blade pc P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S5B.2PPPD6MATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D5OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D5WOOD AND PLASTICS6A Carpentry and JoineryS6A.1 Drywall partition w/ Laminated wall finishVP-Finance, SRD-Manager, COA-Auditor,Managers for Accounting, SPD, Treasury, Property,Internal Audit, BOD Area, Treasury Counter,Main Lobby & Waiting Area and Board Sec. ManagerPPPPPPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTMaterials1. 1/2" thk. x 4' x 8' Marine Plywood (for Padded Wall) pc P P2. 1/4" thk. x 4' x 8' Marine Plywood (for Flush Door) pc P P3. 1.0mm.x 4' x 8' (Wenge-coloured) Formica Laminate sht P P(for Padded Wall)4. 2" x 4" x 12' S4S KD Tanguile - (for Door Jamb) bd.ft. P P5. 2" x 2" x 12' S4S KD Tanguile - (for Flush Door) bd.ft. P P6. 4" Common Wire Nail kg P P7. 3" Common Wire Nail kg P P8. 2" Common Wire Nail kg P P9. 1 1/2" Common Wire Nail kg P P10. Laminate Adhesive gal P P11. Stainless Steel Barrel Bolt "Heavy Duty" pc P P12. Concealed Hinges "Expandable Heavy Duty" pc P P13. Stainless Steel Door Handle pc P P14. Self-drill metal screw box P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.2PPPS6A.2 Drywall Partition (for Door 3)Materials1. 1/2" thk. x 4' x 8' Marine Plywood pc P P2. 2" x 4" x 12' S4S KD Tanguile bdft P P3. Fr. 1 1/2"x2"x12' S4S KD Tanguile bdft P P4. Fr. 1"x4"x12' S4S KD Tanguile bdft P P5. 1.0mm.x 4' x 8' (Wenge-coloured)Formica Laminate sht P P6. 4" Common Wire Nail kg P P7. 3" Common Wire Nail kg P P8. 2" Common Wire Nail kg P P9. 1 1/2" Common Wire Nail kg P P10. Laminate Adhesive gal P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.2PPPS6A.3Glass Frame Partition (for Glass Partition)


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTGP-1,GP-2,GP-3,GP-4,GP-5,GP-6,GP-7,GP-8, GPc-1Materials1. 2" x 4" x 12' S4S KD Tanguile bdft P P2. Fr. 1 1/2"x2"x12' S4S KD Tanguile bdft P P3. Fr. 1"x4"x12' S4S KD Tanguile bdft P P4. 4" Common Wire Nail kg P P5. 3" Common Wire Nail kg P P6. 2" Common Wire Nail kg P P7. 1 1/2" Common Wire Nail kg P P8. Wood Adhesive gal P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.3PPPS6A.4 Drywall Partition and Double Wall PartitionMaterials1. 6.0mm thk. x 4' x 8' Cement Fiber Board pc P P2. 0.5mm thk. x 51mm x 3000mm Metal Studs (Double Wall) pc P P3. 0.5mm thk. x 51mm x 3000mm Metal Track (Double Wall) pc P P4. 0.5mm thk. x 102mm x 3000mm Metal Studs pc P P5. 0.5mm thk. x 102mm x 3000mm Metal Track pc P P6. Perforated tape rl P P7. Blind rivets box P P8. Self-drill metal screw box P PLabor:1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.4Note: Finish and Quality of materials is subject forApproval of the Designing Architect or EngineerS6A.5 Ceiling Board, Joist and HangerMaterials1. 3/4" thk. 4'x8' Marine Plyboard (for cove lighting) sht P P2. 4.5mm. thk. x 4'x8' Cement Fiber Board pc P P3. 7" x 10' PVC Ceiling Panel pc P P4. 0.40mm x 19mm x 50mm x 5.0m, Double Furring Channel pc P P5. 1.0mm x 12mm x 38mm x 5.0m, C-channel pc P P6. 0.40mm x 25mm x 25mm x 3.0m pc P P7. Perforated Tape rl P P8. Blind Rivets box P PPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT9. Self-drill metal screw box P P10. Threaded Hanger Rod 6.00 m long pc P P11. W-clip (double) Carrying Channel Hook ls P PThreaded hanger clip, Steel AngleLabor1. Skilled mh P P2. Unskilled mh P PNote: Finish and Quality of materials is subject for Approvalof the Designing Architect or EngineerMaterial CostLabor CostSub-Total for Item S6A.5PPPS6A.6 Baseboard and Ceiling Cornice at Double wallPartition, Glass Partition, Drywall PartitionMaterials1. fr.1" x 4" x 12' Wooden Baseboard bdft P P(Match Existing)2. fr.1 1/2" x 4" x 12' Wooden Cornice bdft P P(Match Existing)3. 1 1/2" Finishing wire nail kg P P4. 2" Common wire nail kg P P5. Wood Adhesive gal P PRe- used existing Baseboard, Ceiling cornice,Ceiling Cornice Nailer (Corner)Note: Finish and Quality of materials is subject forApproval of the Designing Architect or EngineerLabor1. Skilled mh P PMaterial CostLabor CostSub-Total for Item S6A.6S6A.7 Shelves at Storage/Filing AreaMaterials1. 3/4" thk. 4'x8' Marine Plywood sht P P2. 2" x 2" x 12' S4S KD Tanguile bdft P P3. 2" x 2" x 8' S4S KD Tanguile bdft P P4. Fr.1"x1"x12' K.D.Wooden Tanguile bdft P P5. Wood Adhesive gal P P6. 3" Common Wire Nail kg P P7. 2" Common Wire Nail kg P P8. 1 1/2" Common Wire Nail kg P PPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.7PPPS6A.8 Projector Screen at Conference AreaMaterials1. 3/4" thk. 4'x8' Marine Plywood sht P P2. 2" x 2" x 8' S4S KD Tanguile - 14 pcs bdft P P3. 1.0mm.x 4' x 8' (Wenge-coloured)Formica Laminate sht P P4. Laminate Adhesive ltr P P5. Wood Adhesive gal P P6. 3" Common Wire Nail kg P P7. 2" Common Wire Nail kg P P8. 1 1/2" Common Wire Nail kg P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.8PPPS6A.9 Counter,Cabinet and Shelves at PantryMaterials1. 3/4" thk. x 4' x 8' Marine Plywood pc P P2. 2" x 4" x 12' S4S KD Tanguile bdft P P4. 1.0mm.x 4' x 8' (White)Formica Laminate sht P P5. 4" Common Wire Nail kg P P6. 3" Common Wire Nail kg P P7. 2" Common Wire Nail kg P P8. Laminate Adhesive gal P P9. Stainless Steel Cabinet Handle pc P P10. Concealed Hinges pc P PLabor


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.9PPPS6A.10Counter at Treasury Department, BAC OfficeMaterials1. 3/4" thk. x 4' x 8' Marine Plywood pc P P2. 1/2" thk. x 4' x 8' Marine Plywood (Padded Wall) pc P P3. 2" x 4" x 12' S4S KD Tanguile bdft P P4. 1.0mm.x 4' x 8' (Wenge-coloured)Formica Laminate sht P P5. 4" Common Wire Nail kg P P6. 3" Common Wire Nail kg P P7. 2" Common Wire Nail kg P P8. 1 1/2" Common Wire Nail kg P P9. Laminate Adhesive gal P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S6A.10PPPD7MATERIAL COSTPLABOR COSTPEQUIPMENT COSTPDIRECT COST FOR ITEM D6POCM (_____%)PPROFIT (_____%)PCONTRACTOR'S TAX (2%)PTOTAL COST FOR ITEM D6PTHERMAL AND MOISTURE CONTROLS7F Skylight RoofingS7F.1 Roof at Canopy (Entrance BOD)Materials1. 3.0mm x 1220mm Polycarbonate Opal White lm P PSolid Sheet (Main Roof)2. 1/8"thk. x 1 1/2" x 30' Rubber Tape pc P P3. 3/16" thick x 1 1/2" x 6.0m Aluminum Flat Bar pc P PHardware Accessories:1. Self-drilling metal screw box P P2. Silicon Sealant ctdg P P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S7GPPPS7GMetal RoofingS7G.1 Roofing Extension (Match Existing)Materials1. 0.40mm x 1120mm Rib -type long span lm P P2. 0.40mm x 619mm x 2440mm Pre-painted Ridge roll pc P P3. 0.40mm x 619mm x 2440mm Pre-painted pc P PEnd Flashing (Match Existing)4. 0.40mm x 619mm x 2440mm Pre-painted pc P PEnd Flashing (See Drawing Profile)5. 0.40mm x 619mm x 2440mm Stainless Steel pc P PValley Gutter (See Drawing Profile)6. 0.40mm x 1200mm x 2440mm Stainless Steel pc P PInside Gutter (See Drawing Profile)Hardware Accessories:1. Blind Rivets box P P2. Self Drill Metal Screw box P P3. Silicon Sealant ctdg P P4. Touch Up Paint ltr P PLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S7GPPPMATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D7OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)PPPPPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTTOTAL COST FOR ITEM D7PD8DOORS AND GLASSESS8AWood DoorsMaterials1. 50mmx900mmx2100mm "K.D."Panel door 2 set P PDoor Hardware:w/ 6.0mm thk.Tempered clear glass w/ 1 1/2" dia.SS handle bar and complete fittings and accessorieson 50mm x 127mm KD Tanguile Door jamb(with Frostic sticker "See Design")locaton:(Ante Room) D-41a. Dead Bolt Lock, Antique Brass High security 5-pin tumbler 2 set P Pcylinder with double key operation(E-Z or Approved Equal)1b. 4" x 4" Antique Brass Loose Pin Ball Bearing Type 8 pc P Pwith Queen Tip Door Hinge1c. Door Closer with hold-open function open beyond 85d 2 set P Pthe Door will remain open, Closing speed is adjustablefaster or slower, Reversible right or left hand swing.(E-Z or Approved Equal)2. 50mmx800mmx2100mm "K.D."Panel door w/ 1 1/2" dia. 5 set P PSS handle bar and complete fittings and accessorieson 50mm x 127mm KD Tanguile Door jamb(with Frostic sticker "See Design")locaton:(Public Toilet) D-4aDoor Hardware:2a. Dead Bolt Lock, Antique Brass High security 5-pin 5 set P Ptumbler cylinder with double key operation(E-Zor Approved Equal)2b. 4" x 4" Antique Brass Loose Pin Ball Bearing Type 20 pc P Pwith Queen Tip Door Hinge2c. Door Closer with hold-open function open beyond 85d 5 set P Pthe Door will remain open, Closing speed is adjustablefaster or slower, Reversible right or left hand swing.(Kwikset or Approved Equal)3. 50mm x 900mm x 2100mm Flush hollow core door 5 set P Pwith ¼" thk. marine plywood on 50mm x 127mmKD Tanguile Door jamb "Duco Finish"Finish w/ Varnish/Polyurethene" or any Approved Equallocaton:(Storage/Filing Room) D-5Door Hardware:3a. Cylindrical Lockset Antique Brass, Key Outside and thumb 4 set P Pturn inside with high Security 5-Pin Tumbler Cylinder


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT(E-Z or Approved Equal)3b. 4" x 4" Antique Brass Loose Pin Ball Bearing Type 16 pc P Pwith Queen Tip Door Hinge3c. Door Closer with hold-open function open beyond 85d 4 set P Pthe Door will remain open, Closing speed is adjustablefaster or slower, Reversible right or left hand swing.(E-Z or Approved Equal)4. 50mm x 800mm x 2100mm Flush hollow core door 1 set P Pw/ 1/4" thk. marine plywood on 50mm x 127mmKD Tanguile Door jamb"Finish with Varnish/Polyurethene"or any Approved Equallocaton:(Storage/Filing Room) D-5aDoor Hardware:4a. Cylindrical Lockset Antique Brass, Key Outside and thumb 1 set P Pturn inside with high Security 5-Pin Tumbler Cylinder(E-Z or Approved Equal)4b. 4" x 4" Antique Brass Loose Pin Ball Bearing Type 4 pc P Pwith Queen Tip Door Hinge4c. Door Closer with hold-open function open beyond 85d 1 set P Pthe Door will remain open, Closing speed is adjustablefaster or slower, Reversible right or left hand swing.(E-Z or Approved Equal)Labor1. Skilled mh P P2. Unskilled mh P PNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerS8BMaterial CostLabor CostSub-Total for Item S8ASteel Doors and Frames(Supply and Install)Materials1. 38mm x 910mm x 2100mm Flush Hallow Core, 4 set P P"Flush type door plain", Pre-painted oven baked steelsheets and honey comb chemical treated paper coreinsulation w/ 45mmx100mm single rabbet jamb w/ rubbersilencer and gasket together with panic device.loc:(Fire Exit Door)MD-1Door Handling: (Verify on plan)PPPNote: Finish and Quality of materials is subject forApproval of Designing Architect or Engineer


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTVerify Plan or Coordinate to assigned Engineeror Architect on site the extent of the worksMaterial CostSub-Total for Item S8BPPS8HGlass and GlazingS8H.1 Frameless Doors(Supply and Install)Materials1. 12mm. thk. x 2000mm(W)x2300mm(H) double leaf 1 set P Pframeless tempered clear glass door w/ 1 1/2" dia. SShandle bar and complete atena patch fitting andhardwares w/ 12mm thk.x2000mm(W)x300mm(H)tempered fixed clear glass transomw/ Frostic sticker "See Design"Loc: (Main Entrance) D-12. 12mm. thk. x 1000mm(W)x2300mm(H) 1 set P Pframeless tempered clear glass door w/ 1 1/2" dia. SShandle bar and complete atena patch fitting andhardwares w/ 12mm thk.x1000mm(W)x300mm(H)tempered fixed clear glass transomw/ Frostic sticker "See Design"Loc: (B.O.D. Entrance) D-1a3. 12mm. thk. x 900mm(W)x2200mm(H) 14 set P Pframeless tempered clear glass door w/ 1 1/2" dia. SShandle bar and complete atena patch fitting andhardwares w/ Frostic sticker "See Design"Loc: (Managers and VPs) D-24. 12mm. thk. x 900mm(W)x2200mm(H) 19 set P Pframeless tempered clear glass door w/ 1 1/2" dia. SShandle bar and complete atena patch fitting andhardwares w/ Frostic sticker "See Design"Loc: (Managers,Staff,VPs and Conference) D-3Note: Finish and Quality of materials is subject for Approvalof Designing Architect or EngineerMaterial CostSub-Total for Item S8H.1PPS8H.2Fixed Glass


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTS8H.2.1 Main Entrance (Supply and Install)Materials1. 12mm thk. frameless tempered clear fixed glass with 78.32 sq.ft. P Ppowder coated U-clip frame (Top & Bottom) & neopreneglazing w/ Frostic sticker "See Design" (for FG-1)2. Frosted Sticker (Standard Wide) " See Design" 65 lf P P(for FG-E)S8H.2.2 Treasury Department(Fixed Glass"FG"and Counter) FG-3 (Supply & Install)Materials1. 12mm thk. frameless clear tempered fixed glass 92.00 sq.ft. P Pwith 1 1/2"x1/2" stainless steel snap-on clipand neoprene glazing w/ Frostic sticker "See Design/Verify Detail Plan"Note: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerS8H.3 Glass PartitionS8H.3.1 Glass Partition (GP-1,GP-2,GP-3,GP-4,GP-5,GP-6,GP-7,GP-8, GPc-1) (Supply and Install)Materials1. 6mm thk. x 1200mm(W) x 2400mm(H) clear 86 set P PTempered Fixed Glass with 1 1/2"x1/2" stainless steelsnap-on clip w/ neoprene foam glazing channel withFrostic Sticker" See Design"Loc: (VP's,Conference's,Manager's and Staff Area)Note: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerMaterial CostSub-Total for Item S8H.3S8H.4 Glass and AccessoriesS8H.4.1 Artificial "Waterscape"and Directory Area(Supply and Install)Materials1. 12mm. x 2400mm(W) x 2300mm(H) Frameless Clear 2 set P PTempered Glass (Frameless) w/ Glass Holder 2 setsPPS8H.4.3 Conference Projector Screen/White Board at BODConference Room/and Conference Room 01(Supply and Install)1. 6mm thk.x1200mmx2400mm frameless clear tempered 2 set P Pglass w/ ½" thk. Plywood backing painted "Flat White"


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerMaterial CostSub-Total for Item S8H.4PPS8JAluminum Windows(Supply and Install)Materials1. 1400mm(W) x 1200mm(H) Analok awning window 5 set P Pwith 1/4" thk. single pane glass on Aluminum FrameW1 (match existing)Loc: (VP-Finance, Internal Audit Dept.,StaffSupply & Purchasing Manager)2. 1000mm(W) x 500mm(H) Analok sliding window 6 set P Pwith 1/4" thk. single pane glass on Aluminum FrameW2 (match existing)Loc: (VP-Finance Toilet, Public Toilet(Gents/Ladies)3. 2000mm(W) x 500mm(H) Analok awning window 3 set P Pwith 1/4" thk. single pane glass on Aluminum FrameW2a (match existing)Loc: (COA-Stock/Filing Room)Material CostSub-Total for Item S8JPPD9MATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D8OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D8FINISHESS9APlasteringS9A.1 (Toilets Door,Windows,Column,Beam and Wall)Materials1. Portland Cement Type I (40 kg./bag) bag P P2. River Washed Sand cu.m. P PPPPPPPPPLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostPLabor CostPSub-Total for S9A.1P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTS9BPaintingS9B.1 Shelves and Cabinets(Wooden Surfaces)Materials1. Flatwall Enamel tin P P2. Semi-Gloss Enamel tin P P3. Tinting-Color (Set/liter) box P P4. Lamp Black Tinting-Color ltr P P5. Paint Brush 2" pc P P6. Paint Brush 3" pc P P7. Paint Brush 4" pc P P8. Roller Brush w/ Handle 7" pc P P9. Roller Brush Leaf 7" pc P P10. Patching Compound bag P P11. # 180 Sand Paper pc P P12. # 150 Sand Paper pc P P13. Roller Board 7" pc P P14. Putty Plate # 4 pc P P15. Putty Plate # 6 pc P P16. Paint thinner gal P P17. Stopa Rug kg P PLabor1. Painter mh P PMaterials CostLabor CostSub-Total for Item S9B.1PPPS9B.2Exteriors and Interior Walls(Fiber cement board, Masonry/Concrete Surfaces)Materials1. Flat Latex tin P P2. Semi-Gloss Latex tin P P3. Acri-Color (Set/liter) box P P4. Lamp Black Acri-Color ltr P P5. Acrylic Emulsion (Interior) gal P P6. Paint Brush 2" pc P P7. Paint Brush 3" pc P P8. Paint Brush 4" pc P P9. Roller Brush w/ Handle 7" pc P P10. Roller Brush Leaf 7" pc P P11. Patching Compound bag P P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT12. # 180 Sand Paper pc P P13. # 150 Sand Paper pc P P14. Roller Board 7" pc P P15. Putty Plate # 4 pc P P16. Putty Plate # 6 pc P P17. Stopa Rug kg P PLabor1. Painter mh P PMaterials CostLabor CostSub-Total for Item S9B.2PPPS9B.3 Stair, Railing, Trusses, Metal Door and GrillesMaterials1. Quick drying enamel tin P P2. Red Oxide tin P P3. Paint thinner gal P P4. Paint Brush 1" pc P P5. Paint Brush 2" pc P P6. Paint Brush 3" pc P P7. Paint Brush 4" pc P P8. Lacquer Putty gal P P9. Stopa Rug kg P PLabor1. Painter mh P PMaterials CostLabor CostSub-Total for Item S9B.3PPPS9B.4 Door, Door Jamb & Glass Frame ( Glass Partition)Materials1. Wood Stain gal P P2. Varnish gal P P3. Polyurethane gal P P4. Lacquer Thinner gal P P5. Paint Brush 1" pc P P6. Paint Brush 2" pc P P7. Paint Brush 3" pc P P8. #180 Sand Paper pc P P9. #150 Sand Paper pc P P10. Stopa Rug kg P PLabor


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT1. Painter mh P PMaterials CostLabor CostSub-Total for Item S9B.4PPPS9CCeramic Tile WorkS9C.1 Utility Room,Main Entrance, Fire Exit Conc. PadMaterials1. 300mm x 300mm Ceramic Floor Tile pc P P2. 300mm x 300mm Ceramic Floor Tile pc P P(match existing entrance tiles)3. 200mm x 200mm Waffle Floor Tile pc P P4. Tile Adhesive bag P PNote: Finish and Quality of materials is subject forApproval of the Designing Architect or EngineerLabor1. Skilled mh P P2. Unskilled mh P PMaterials CostLabor CostSub-Total for Item S9CPPPS9DVinyl TilesS9D.1 Pantry, Storage/Filing Room, Vault AreaMaterials1. 5.0mm x 600mm x 600mm Vinyl Tiles (Marble Series) pc P P2. Tile Adhesive gal P PNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerLabor1. Skilled mh P P2. Unskilled mh P PMaterials CostLabor CostSub-Total for Item S9DPPPS9ESuspended Acoustic Ceiling SystemS9E.1 Staff Area, COA Stock/Filing AreaMaterials


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT1. 600mm x 1200mm Mineral Fiber pc P Pacoustic ceiling board2. 1" x 1" x 4' USG Type Ceiling "Aluminum" pc P Pcross tee runner3. 1" x 1 1/2" x 12' USG Type Ceiling "Aluminum" pc P Pmain tee runner4. 1" x 1" x 10' USG Type Ceiling "Aluminum" wall angle pc P PNote: Finish and Quality of materials is subject for Approvalof Designing Architect or EngineerLabor1. Skilled mh P P2. Unskilled mh P PMaterials CostLabor CostSub-Total for Item S9E.1PPPS9E.2 VP's and Manager's AreaMaterials1. 600mm x 600mm Mineral Fiber " Beveled Type" pc P Pacoustic ceiling board2. 1" x 1" x 4' USG Type Ceiling "Aluminum" pc P Pcross tee runner3. 1" x 1" x 2' USG Type Ceiling "Aluminum" pc P Pcross tee runner4. 1" x 1 1/2" x 12' USG Type Ceiling "Aluminum" pc P Pmain tee runner5. 1" x 1" x 10' USG Type Ceiling "Aluminum" pc P Pwall angleNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerLabor1. Skilled mh P P2. Unskilled mh P PMaterials CostLabor CostSub-Total for Item S9E.2PPPS9GStone WorkS9G.1 Artificial WaterscapeSupply and InstallMaterials1. Stone Works "ashlar stone" for waterscape 11.85 sq.m. P P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT2. Stone Works "ashlar stone" for Column 16.45 sq.m. P PNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerMaterial CostSub-Total for Item S9GPPS9HCarpetingS9H.1 B.O.D.,VPs,Managers,Conference and Staff AreasProvident Fund, COA Office & BAC OfficeSupply and InstallMaterials1. 500mm x 500mm Carpet Tiles 57.0 sq.m. P P"WC5006 Winter Rose" (For B.O.D. Conference Room-01,Conference Room-02)2. 500mm x 500mm Carpet Tiles 55.0 sq.m. P P"WC5001 Aswan Straw" (For VPs,AVPs)3. 500mm x 500mm Carpet Tiles 154.0 sq.m. P P"WC5006 Winter Rose" (For SPD,PD,IAD,BSO,AD,TD,SRD, and COA Managers)4. Carpet Tiles Adhesive gal P PTechnical Specifications:Fibre: 100% BCF Olefin solution dyedConstruction: Tufted, TexturedStiches/Inch: 1/10" Loop pileTotal Thickness: 7mmBacking: PVC+Glass fiber spunbondedNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerMaterial CostSub-Total for Item S9HPPS9M Marble and Granite WorkS9M.1 Marble WorkPublic Toilet, VP-Toilet, B.O.D. Toilet,Counter (Treasury Department and BAC Office)Supply and InstallMaterials


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT1. Marble/Granite (Standard thickness for Counter) 24.00 sq.m. P Pfor Ladies,Gent's,VP's Toilet2. Marble Adhesive gal P PNote: Finish and Quality of materials is subject for Approvalof the Designing Architect or EngineerMaterial CostSub-Total for Item S9M.1PPS9M.2 Granite WorkMain Lobby, Hallways, Staff Office, ToiletMaterials1. 600mm x 600mm Granite Floor Tiles (Glazed) 4,263 pc P Pfor Main Lobby, Public Waiting Area,Hallways,Staff Office2. 500mm x 500mm Granite Floor and Wall Tiles (Glazed) 1,649 pc P Pfor Public Toilets (Ladies,Gent's and Ante Room),VP-Toilet, B.O.D. Toilet3. Tiles Adhesive gal P PNote: Finish and Quality of materials is subject forApproval of the Designing Architect or EngineerLabor1. Skilled mh P P2. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S9M.2PPPS9NVinyl Wall CoveringS9N.1B.O.D.,VPs,Managers,Conference and Staff Areas,Provident Fund, COA Office, BAC OfficeSupply and InstallMaterials1. WC126604FD Fabric Backed Vinyl Wall Covering 79.42 sq.m. P PStrippable,Scrubbable and Fire Retardant(For B.O.D. Conference Room-01,Conference Room-02)2. WC108807FD Fabric Backed Vinyl Wall Covering 52.80 sq.m. P PStrippable,Scrubbable and Fire Retardant(For VPs,AVPs)3. WC109910FD Fabric Backed Vinyl Wall Covering 432.00 sq.m. P P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTStrippable,Scrubbable and Fire Retardant(For SPD,PD,IAD,B.O.D,AD,TD,COA,SPD, Managers)4. WC109909FD Fabric Backed Vinyl Wall Covering 1682.16 sq.m. P PStrippable,Scrubbable and Fire Retardant(For SPD,PD,IAD,B.O.D,AD,TD,COA,SPD,Staff,Provident Fund Office,BAC Office)5. WC124101FD Fabric Backed Vinyl Wall Covering 335.64 sq.m. P PStrippable,Scrubbable and Fire Retardant(For Main Lobby, Waiting Area and Hallways)6. Vinyl Wall Adhesive gal P PTechnical Specifications:American Standard High Quality Fabric BackedVinyl Wall covering, Class A Fire Retardant,Strippable, Scrubbable.Note: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerMaterial CostSub-Total for Item S9N.1PPS9QVertical BlindsS9Q.1 B.O.D. Lounge and B.O.D. Conference RoomSupply and InstallMaterials1. Fabric Vertical Blinds 287.00 sqft. P P(as per Architect's approved sample and specification)Note: Finish and Quality of materials is subject for Approvalof Designing Architect or EngineerMaterial CostSub-Total for Item S9QPPMATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D9OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D9PPPPPPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTD10 SPECIALTIESS10A Toilet AccessoriesS10A.1 Public Toilet (Gent's/Ladies)Materials1. Cadet 11 EL FV 2459, 666mm x 374mm x 380mm, 14 set P PElongated flush valve toilet with Complete fittingand Accessories2. Expression Round Vessel 1470, Above-Counter Lavatory 10 set P Pwith Complete fittings and accessories2a. Faucet " Sensor Auto Faucet" self generating 10 set P P3. Washbrook 6510, 370mm x 475mm x 690mm 6 set P PUrinal, with Complete fittings and accessories4. 600mm x 800mm "Oval" Vanity frameless mirror with 10 pc P Pplywood backing and 25mm bevelled edge all around5. 4" x 4" Stainless steel floor drain 4 pc P P6. Floor Flange with Ball Wax 14 set P P7. Floor clean out cover "Bronze type" 12 set P P8. Silicon Sealant 15 ctdg P P9. 200mm x 300mm Stainless steel trash/tissue 4 set P Pcompartment10. Spray Combination "Heavy duty" 14 set P PNote: Finish and Quality of materials is subject for Approvalof Designing Architect or EngineerAll fixtures shall be of quality brandLabor1. Skilled mh P PMaterial CostLabor CostSub-Total for Item S10A.1PPPS10A.2 VP,B.O.D. ToiletMaterials


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT1. Cadet 11 EL FV 2459, 666mm x 374mm x 380mm, 2 set P PElongated flush valve toilet with Complete fittingand Accessories1a. Self-Powered Auto-Valve Unit-Sensor "Water Closet" 2 set P P2. Expression Round Vessel 1470, Above-Counter Lavatory 2 set P Pwith Complete fittings and accessories2a. Faucet " Sensor Auto Faucet" self generating 2 set P P3. Washbrook 6510, 370mm x 475mm x 690mm 2 set P PUrinal, with Complete fittings and accessories4. 600mm x 800mm "Oval" Vanity frameless mirror with 2 pc P Pplywood backing and 25mm bevelled edge all around5. 4" x 4" Stainless steel floor drain 2 pc P P6. Floor Flange with Ball Wax 2 set P P7. Floor clean out cover "Bronze type" 2 set P P8. Silicon Sealant 5 ctdg P P9. 200mm x 300mm Stainless steel trash/tissue 2 set P Pcompartment10. Spray Combination "Heavy duty" 2 set P PNote: Finish and Quality of materials is subject for Approvalof Designing Architect or EngineerAll fixtures shall be of quality brandLabor1. Skilled mh P PMaterial CostLabor CostSub-Total for Item S10A.1PPPS10A.2 Pantry at Utility RoomSupply and InstallMaterials1. Stainless Steel Kitchen Sink with Complete Fittings, Faucet 1 set P P2. Heavy Duty Faucet 1 pc P PLabor1. Skilled mh P PMaterial CostLabor CostSub-Total for Item S10A.2PPPS10B Toilet PartitionS10B.1 Public Toilet (Gent's/Ladies) Supply and Install


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTMaterials1. Solid Plastic High Density Polyethylene Compartment 14 set P PStall with Hardware & Accessories (see detailed plan)2. 600mm x 1100mm 6 pc P PSolid Plastic High Density Polyethylene CompartmentStall with Hardware and Accessories (for urinal)S10B.2 VP,B.O.D. ToiletSupply and InstallMaterials1. Solid Plastic High Density Polyethylene Compartment 2 set P PStall with Hardware and Accessories (see detailed Plan)2. 600mm x 1100mm 2 pc P PSolid Plastic High Density Polyethylene CompartmentStall with Hardware and Accessories (Urinal)Note: All Hardwares and Accessories shall be Stainless SteelFinish and Quality of materials is subject for Approvalof Designing Architect or EngineerMaterial CostSub-Total for Item S10BPPMATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D10OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D10D15 MECHANICALD15A PLUMBINGS15A.1 Water SystemMaterial1. 1½" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P2. 1½" dia. Elbow G.I. pc P P3. 1½" Tee G.I. pc P P4. 1½" Coupling G.I. pc P P5. 1½" Union Patente G.I. pc P P6. 1½" x 1½" x 1¼" Tee G.I. pc P P7. 1¼" x 1 Coupling Reducer G.I. pc P P8. 1¼" Gate Valve pc P P9. 1¼ x 1¼" x 1" Tee G.I. pc P P10. 1" Elbow G.I. pc P P11. 1¼" Union Patente G.I. pc P PPPPPPPPP


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT12. 1¼" x ¾" Tee G.I. pc P P13. ¾" x ½" Elbow pc P P14. 1¼" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P15. 1" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P16. ¾" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P17. ½" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P18. Teflon Tape ¾ pc P P19. Gasket Cement btl P P20. 1" Gate Valve Kit pc P P21. ½" Elbow G.I. pc P P22. Submersible Pump for clear water with complete 1 set P Pfittings and accessories (see specifications on plumbing)23. Hacksaw Blade with Handle pc P PLaborer1. Skilled mh P P2. Unskilled mh P PEquipment RentalConcrete Breaker day P PMaterial CostLabor CostEquipment Rental CostSub-Total for Item S15A.1PPPPS15B.2 Sewer SystemMaterial1. 100mm x 3.00m Series 1000' PVC Pipe pc P P2. 100mm x 100mm Cross Tee PVC pc P P3. 100mm x 100mm Wye PVC pc P P4. 100mm x 75mm Tee PVC pc P P5. 75mm x 50mm Tee PVC pc P P6. 75mm x 75mm Elbow 90º PVC pc P P7. 100mm PVC Clean out with Plug pc P P8. 75mm x 75mm PVC P-trap pc P P9. 75mm x 3.00m PVC Pipe pc P P10. 50mm x 3.00mm PVC Pipe pc P P11. 50mm Elbow 90º PVC pc P P12. Solvent Cement 400mg pc P P13. 100mm Elbow 90º PVC can P P14. 4 inches dia. Exhaust outlet stainless pc P PLaborer Skilled1. Unskilled mh P P


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTMaterial CostPLabor CostPSub-Total for Item S15A.2PD15D AIR-CONDITIONING & VENTILATING SYSTEMS15D Air-conditioning UnitS15D.1 SRD and VPs AreaSupply and InstallMaterials1. 1.5 Hp Split Type Wall Mounted Single Phase, 230V, 2 set P P60 Hz ACU complete with standard accessoriesPower Inverter and Remote Controller(Supply and Install to include pipings and drains)2. 2.0 Hp Split Type Wall Mounted Single Phase, 230V, 1 set P P60 Hz ACU complete with standard accessoriesPower Inverter and Remote Controller(Supply and Install to include pipings and drains)3. 3.0 Hp Split Type Floor Mounted Single Phase, 230V, 2 set P P60 Hz ACU complete with standard accessoriesPower Inverter and Remote Controller(Supply and Install to include pipings and drains)Material CostSub-Total for Item S15D.1PPS15D.2 Relocation of Existing Air-Con DiffuserMaterials (for Additional Airduct, Brackets and Hangers)1. g.a. #20, Plain G.I. Sheet sht P P2. Foam Duct Insulation (Standard Size & Thickness) roll P P3. Brackets, Hangers & Tapers ls P PRelocation for existing Diffuser, Airduct, Bracket & hangersLabor:Skilled1. Unskilled mh P PMaterial CostLabor CostSub-Total for Item S15D.2PPPNote: Finish and Quality of materials is subject forApproval of Designing Architect or EngineerVerify Plan or Coordinate to assigned Engineeror Architect on site the extent of the removal works


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTMATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D15OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D15PPPPPPPPD16ELECTRICALS16A Electrical Works (New Installation)Materials:1. 3.5mm² THHN cu wire 600v roll P P2. 5.5mm² THHN cu wire 600v roll P P3. 20mm ø x 3mts uPVC pipe sch. 40 orange color pc P P4. 20mm ø uPVC pipe adapter endbell orange color pc P P5. 15mm one hole RSC straps Galv. Ga. 16 pc P P6. Duplex universal receptacle outlet, white color, 16A 251 set P P7. 250v w/ metallic dark brown color faceplate wide series8. Pop-up floor grounding duplex universal outlet, 11 set P P16A, 250v with cover unit and outlet box aluminum9. Duplex universal receptacle outlet, white color, 16A 6 set P P250v w/ metallic dark brown color faceplate wideseries GFCI -rated10. 55mm x 100mm x 55mm Utility box galv. 18 with pc P P15-& 20mm ø concentric knockout11. 55mm x 100mm Octagonal galv. ga. 18 with pc P P15-& 20mm ø concentric knockout w/ cover12. Hand dryer 230v manual push button 6 set P P13. 4" x 4"x 2 ⅛" square box Galv. Ga. 18 w/ cover set P P14. 25mm ø x 3 mts uPVC pipe sch. 40, orange color pc P P15. 25mm ø uPVC pipe adapter endbell orange color pc P P16. 40AT,2P, 240v Bolt-on Type TQC CB 3 set P Pin NEMA 3R enclosure17. 30AT,2P, 240v Bolt-on Type TQC CB in NEMA 3R enclosure 2 set P P18. 11W, 230V CFL warm white, down light 4" dia. w/ 220 set P Pmirrorized reflector frosted glass and back circularedge/rim cover19. Square lighting fixture with 4-14watts,230v CFL daylight 79 set P P20. Square lighting fixture with 4-14 watts, 230v 3 set P PCFL warm white21. 2 x 18watts Day light fluorescent lighting fixture 74 set P Precessed & T-runner type mounted 0.60m x 0.60m,208v high power factor, sound rated 'A' electric


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTballast, zinc phosphated steel sheet housing withpowder coat finish, mirrorized aluminum reflector,⅛" thick polycarbonate diffuser.22. 2 x 18watts Warm white fluorescent lighting fixture 6 set P Precessed & T-runner type mounted 0.60m x 0.60m,208v high power factor, sound rated 'A' electricballast, zinc phosphated steel sheet housing withpowder coat finish, mirrorized aluminum reflector,⅛" thick polycarbonate diffuser.23. 28w, 230v Electronic Ballast T-5 Fluorescent 38 set P Plighting fixture, warm white24. 2 x 32 watts, 110-240v high power factor, sound 188 set P Prated 'A' Electronic Ballast.25. 32 watts, Fluorescent Tube, Daylight 376 pc P P26. 2' x 4' x 1/8" thick Polycarbonate diffuser, white 188 pc P P27. Spherical wall lamp 10" diameter, frosted color 2 set P Pwith 14 watts, 230v CFL, daylight28. 35 watts, 230v Halogen multi-directional spotlight 7 set P Pblack color29. Vertical down lights, surface type without cover 5 set P Pwith 14 watts, 230v CFL, warm white30. Wallighter, 70 watts, HPS bulb, 230v reactor type ballast 8 set P P31. 15mm ø (½") dia. Cable glands pc P P32. 2.0mm² two wire royal cord mts P P33. One way, one pole, one gang switch 16A, 250v, 22 set P Pwhite color with metallic dark brown colorfaceplate, wide series34. One way, one pole, two gang switch 16A, 250v, 30 set P Pwhite color with metallic dark brown colorfaceplate, wide series35. One way, one pole, three gang switch 16A, 250v, 9 set P Pwhite color with metallic dark brown colorfaceplate, wide series36. Three way switch, one gang 16A, 250v, 22 set P Pwhite color with metallic dark brown colorfaceplate, wide series37. Photoelectric control, 220v, 1800VA turn and lock 2 set P Pwith mounting bracket and locking type receptacle38. 15mm ø x 3 mts RSC pipe with coupling at one end pc P Pschedule 4039. Exhaust fan 27cm x 27cm 220V, 4" dia. Pipe type 10 set P P40. 4" ø Exhaust fan ventilating outlet, stainless 9 set P P41. 4" ø Flexible duct mts P P42. CAT6 Data Modular Jack white color w/ 88 set P Pmetallic dark brown color faceplate, wide series43. Duplex outlet (CAT 5E Data Modular Jack and 50 set P PTelephone Modular Jack) white color with


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNTmetallic dark brown color faceplate wide series44. Pop-up floor outlet, three gang, (2-Telephone 6 set P PModular Jack 6P4C + 1- CAT 6E Data Modular Jack)with cover unit and outlet box45. Pop-up floor outlet, duplex (Telephone Modular Jack) 4 set P P6P4C + 1 Data Modular Jack) with cover unit and outlet box46. CAT 5E 24 AWG 4P LAN cable roll P P47. Data plug 8/8 RJ4548. 20AT, 2P, 250V, TQC, Bolt-on type CB 11 set P P49. 20AT, 1P, 250V, TQC, Bolt-on type CB 2 pc P P50. Electrical panel board, surface mounted, three phase 1 set P Pfour wire w/ neutral terminal, 1/8" x 1" cross sectioncopper bus bar with combination type lugs, typelugs, XLH cast copper alloy solderless connectorBranches:10 KAIC 240 VAC TQC Bolt-on type30 AT 2P 240 VAC - 5 set40 AT 2P 240 VAC - 3 set51. Pop-up floor outlet one gang CAT 6E Data modular jack 1 set P P52. Duplex outlet Telephone Modular Jack white color 1 set P Pwith metallic dark brown color faceplate wide series53. Telephone Modular Jack white color with metallic 2 pc P Pdark brown color faceplate wide series54. 32mm dia. x 3mts uPVC Pipe shc. 40 orange color pc P P55. 32mm dia. uPVC adapter endbell orange color pc P P56. Key lockable switch 15A, 250V with metallic dark set P Pbrown color faceplate57. 32W, Fluorescent lighting fixture industrial type, 4 set P Pmirrorized reflector, 208V high power factor soundrated 'A' electronics ballast58. Electric plastic tape roll P P59. #16 G.I. Tie Wire kg P P60. PVC Solvent 400ml can P P61. Self Drill Metal Screw box P PFIRE ALARM SYSTEM1. Fire Alarm Control Panel (FACP) with the following 1 set P Pfeatures: 115/230 VAC input power, 24 VDC3.0 Amp output power with two (2) 12V 6.5 AmpereHour Batteries, Class B or Class A Detection <strong>Zone</strong>swiring options, 6-<strong>Zone</strong>, Class B bell circuit output,lamp test, alarm test, trouble silence, alarm silenceand reset switches, LEDs for power, trouble, groundfault and zone alarm. UL/FM approved & includingthe following compatible fire alarm system devices.2. Smoke detector, photo electronics, plug-in type, 3% 68 set P P+ 0.7%/ft sensitivity, operating temperature range


<strong>ESTIMATE</strong> <strong>SHEET</strong>PROJECT : PROPOSED RENOVATION OF BUILDING 2121LOCATION : E.Quirino Avenue, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>ITEM UNIT TOTALDESCRIPTION QTY UNITNO. COST AMOUNT(0º to 49ºC) single circuit, UL listed with mountingplate and base for 4" or ¾" octagonal junction boxmounting3. 2.0mm² THHN Cu wire 600V roll P P4. 15mm dia x 3mts Electrical Metallic Tubing (EMT) pc P P5. 15mm dia. EMT connector set screw type pc P P6. 15mm dia. EMT coupling set screw types pc P P7. 55mm x 100mm x 55mm Utility box galv. ga. 18 w/ pc P P15-& 20-mm concentric knockout8. 55mm x 100 Octagonal box, galv. ga. 18 with pc P P15-& 20-mm concentric knockout9. 15mm dia. Flexible Metallic Conduit (FMC) mt P P10. 15mm dia. Flexible Metallic Conduit connector pc P P11. 15mm dia. One hole RSC strap ga. 16 pc P P12. #8 Tox with metal screw pc P PLabor Electrician1. Helper Electrician mh P PMATERIAL COSTLABOR COSTEQUIPMENT COSTDIRECT COST FOR ITEM D16OCM (_____%)PROFIT (_____%)CONTRACTOR'S TAX (2%)TOTAL COST FOR ITEM D16PPPPPPPP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!