Killian Creek WWTP - NC AWWA-WEA Killian Creek WWTP - NC AWWA-WEA
WWTP CONSOLIDATIONEVALUATION• Alternative 1 – Continued Operation of TwoWWTPs• Alternative 2 - Permanent Closure of ForneyCreek WWTP• Alternative 3 -Temporary Closure of ForneyCreek Until Additional Capacity is Needed
CONCLUSIONS• Killian Creek Expansion to 3.3 MGD is MoreCost Effective Than Upgrade of Forney Creekfor Continued Operation with Future EffluentPhosphorus Limits.• Temporary Closure of Forney Creek WouldPresent Ongoing Maintenance Issues and PublicOpposition Upon Reopening.
- Page 1: KILLIAN CREEK WASTEWATERTREATMENT P
- Page 6 and 7: FORNEY CREEK WWTP MONTHLY AVERAGE F
- Page 8 and 9: • Planning AreaPOPULATION ANDDEMO
- Page 10 and 11: LINCOLN COUNTY 2005PLANNING DILEMMA
- Page 12 and 13: FORNEY CREEK WWTPMODIFICATIONS• M
- Page 14 and 15: OPTIMIZATION OR UPGRADEOF EXISTING
- Page 17 and 18: REGIONAL TREATMENTCONSIDERATIONS•
- Page 19 and 20: KILLIAN CREEK WWTPCONVEYANCE OPTION
- Page 21: KILLIAN CREEK WWTPCONVEYANCE OPTION
- Page 25 and 26: THE REST OF THE STORY• Killian Cr
- Page 27 and 28: THE REST OF THE STORY• Killian Cr
- Page 29 and 30: FIGURE 4.1 COMBINED FORNEY CREEK &
- Page 31: FIGURE NO. 4.3 LINCOLN COUNTY SEWER
- Page 35: KILLIAN CREEK WASTEWATERTREATMENT P
<strong>WWTP</strong> CONSOLIDATIONEVALUATION• Alternative 1 – Continued Operation of Two<strong>WWTP</strong>s• Alternative 2 - Permanent Closure of Forney<strong>Creek</strong> <strong>WWTP</strong>• Alternative 3 -Temporary Closure of Forney<strong>Creek</strong> Until Additional Capacity is Needed