Operating Manual - Webshop, Gas Analysis Technology
Operating Manual - Webshop, Gas Analysis Technology Operating Manual - Webshop, Gas Analysis Technology
86 INTRODUCTIONThe patented M&C EC30 gas cooler with universal unit EC-F and EC-30/FD with unit EC-FD is alwaysto be installed in situations where there is interference from moisture in the gas to be measured, or ifthe measured components exhibit very high sensitivity to water vapour or if long and expensive heatedsampling lines are to be avoided.Reduction of the gas temperature inside the cooler to a stable and very low dew point effects acondensing out of the sample gas. Dry gas leaves the gas cooler and passes into the analyser aftersuitable filtration. When installing the EC30(/FD) gas cooler on site in a frost-free protective housing,there is no need to use a heated sample line with a high energy consumption as long as the ambienttemperature does not fall below a value of -25 C.6.1 SERIAL NUMBERThe type plate with the serial number is located at the side panel of the cooler housing (19“ version).Whenever you call M&C regarding questions or orders for the spares please give us the serial numberof your EC30.Gas sampling and gas conditioning technology3-4.20-ME
97 APPLICATIONThe patented M&C ultra-low temperature cooler EC-30(/FD) finds its applications in the analytical fieldfor reducing the dew point of humid sample gases, providing a stable and very low dew point andreducing aerosol formation in the analyser. By mounting the cooler near to the sample point, costlyenergy consuming heated sample lines can be avoided. An extremely stable and low gas dew pointavoids water vapour cross-sensitivity and volumetric errors.Figure 1 shows a typical example of an application for installation of an EC-30 gas cooler unit.EC-301Sample gas INEC-Samplegas OUTCondensateOUTTest gasINFilter sample probe SP... Universal unit EC-FD Membrane pump AnalyserHeated sample line 3-way-ball valve Flow meter FMEC-30/FD cooler Super-fine filter FP... Aerosol filter CLFDeep cooling stage 1 Deep cooling stage 2 Pre cooling stageFigure 1 Example of application of EC-30/FDThe gas to be measured is taken from the EC-30/FD gas cooler by a gas sample probe andcooled down to a dew point of -30°C. Via the universal unit EC-FD the condensate is removed. Thesuper-fine filter located afterwards removes solid particles. For increased operating safety of theentire system we recommend installing a super-fine filter with a liquid alarm sensor. If required anaerosol filter can be installed in front of the flow meter . The gas thus treated can now be passedinto the analyser . Via the 3-way-ball valve it is possible to feed test gas for calibration to theanalyser.Gas sampling and gas conditioning technology3-4.20-ME
- Page 1: Operating ManualLow-temperature ele
- Page 4 and 5: 4Dear customer,we have made up this
- Page 6 and 7: 63 SAFETY INSTRUCTIONSPlease take c
- Page 10 and 11: 108 TECHNICAL DATACooler series EC
- Page 12 and 13: 1210 FUNCTIONThe patented M&C EC30(
- Page 14 and 15: The heat energy from the cooling sy
- Page 16 and 17: 16N O TE!When fixing the connectors
- Page 18 and 19: 1814 START-UPThe control electronic
- Page 20 and 21: 2015CLOSING DOWNNOTE!The location f
- Page 22 and 23: 22Take away conveying beltconnector
- Page 24 and 25: 2417 TROUBLE SHOOTINGTroubleshootin
- Page 26 and 27: 2618EC AUTOMATICCONTROL BOARDFigure
- Page 28 and 29: 2818.2 TEMPERATURE SETTING FOR THE
- Page 30 and 31: 30Figure 14 Sensor voltage as funct
- Page 32 and 33: 3220.1 FUNCTION SEQUENCE OF THE EC3
- Page 34 and 35: 3421 SPARE PARTS LISTWear, tear and
- Page 36 and 37: 36Sample outlet dew point (ambient
- Page 38 and 39: 38Figure 18 Circuit Diagram EC-30Ga
- Page 40: 40Figure 20 Wiring plan automatic c
97 APPLICATIONThe patented M&C ultra-low temperature cooler EC-30(/FD) finds its applications in the analytical fieldfor reducing the dew point of humid sample gases, providing a stable and very low dew point andreducing aerosol formation in the analyser. By mounting the cooler near to the sample point, costlyenergy consuming heated sample lines can be avoided. An extremely stable and low gas dew pointavoids water vapour cross-sensitivity and volumetric errors.Figure 1 shows a typical example of an application for installation of an EC-30 gas cooler unit.EC-301Sample gas INEC-Samplegas OUTCondensateOUTTest gasINFilter sample probe SP... Universal unit EC-FD Membrane pump AnalyserHeated sample line 3-way-ball valve Flow meter FMEC-30/FD cooler Super-fine filter FP... Aerosol filter CLFDeep cooling stage 1 Deep cooling stage 2 Pre cooling stageFigure 1 Example of application of EC-30/FDThe gas to be measured is taken from the EC-30/FD gas cooler by a gas sample probe andcooled down to a dew point of -30°C. Via the universal unit EC-FD the condensate is removed. Thesuper-fine filter located afterwards removes solid particles. For increased operating safety of theentire system we recommend installing a super-fine filter with a liquid alarm sensor. If required anaerosol filter can be installed in front of the flow meter . The gas thus treated can now be passedinto the analyser . Via the 3-way-ball valve it is possible to feed test gas for calibration to theanalyser.<strong>Gas</strong> sampling and gas conditioning technology3-4.20-ME