10.07.2015 Views

NWT Air Quality Report (2011) - Environment and Natural ...

NWT Air Quality Report (2011) - Environment and Natural ...

NWT Air Quality Report (2011) - Environment and Natural ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

History of <strong>Air</strong> <strong>Quality</strong> Monitoring in the Northwest Territories (cont.)2005 • NO xanalyzer is installed in March at the Fort Liard station.• O 3<strong>and</strong> NO xanalyzers are installed at the Norman Wells station in April.• O 3analyzer purchased by <strong>Environment</strong> Canada (Yellowknife office) is installed atthe Inuvik station in April.• Due to years of significant data loss caused by extreme cold, the partisoldichotomous fine particulate sampler at the Yellowknife Post Office station isrelocated indoors at the Sir John Franklin station.• The Yellowknife Post Office station is officially closed after the last TSP sampleran on December 6, 2005.• Development of an <strong>Air</strong> <strong>Quality</strong> web site begins. The web site will link with thedata management, analysis <strong>and</strong> reporting system to provide public access to airquality data for each monitoring location. Access to archived data will also beavailable by querying the database using web-based tools.2006 • Yellowknife – A BAM particulate matter (PM 10) monitor is installed <strong>and</strong> beginscollecting data in April.• Inuvik – A BAM particulate matter (PM 10) monitor is installed <strong>and</strong> beginscollecting data in October.• The <strong>Air</strong> <strong>Quality</strong> Monitoring Network web site is officially released.2007 • Fort Liard – A BAM particulate matter (PM 10) monitor <strong>and</strong> an ozone (O 3) analyzerare installed <strong>and</strong> begin collecting data in late August.• Completed the second phase of the <strong>Air</strong> <strong>Quality</strong> Monitoring Network website, which included database related modifications as well as web designimprovements.2008 • No significant changes to the network.2009 • Norman Wells – PM 10BAM installed to complete particulate samplingthroughout the network.• Yellowknife – Hi-vol sampler discontinued from all NAPS stations.• Daring Lake particulate monitoring temporarily discontinued due to malfunction.2010 • Norman Wells – PM 10BAM installation completed.• Inuvik – Entire station is relocated to a more representative location due toongoing construction activities in the original location.• Yellowknife – PM 2.5monitor upgraded to BAM FEM (Federal EquivalencyMethod).<strong>2011</strong> • Inuvik – PM 2.5monitor upgraded to BAM FEM (Federal Equivalency Method)• Data acquisition <strong>and</strong> management system upgraded in Yellowknife, NormanWells <strong>and</strong> Inuvik, including Envista ARM software <strong>and</strong> PC-based industrial dataloggers.• Manual partisol dichotomous sampler installed in Yellowknife.• BAMs at all stations begin reporting in actual conditions instead of STP, as perfederal protocol.32 <strong>NWT</strong> <strong>Air</strong> <strong>Quality</strong> <strong>Report</strong> <strong>2011</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!