10.07.2015 Views

Wembley Sports Park Integrated Access, Traffic and Car Parking Plan

Wembley Sports Park Integrated Access, Traffic and Car Parking Plan

Wembley Sports Park Integrated Access, Traffic and Car Parking Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AECOM<strong>Wembley</strong> <strong>Sports</strong> <strong>Park</strong> <strong>Integrated</strong> <strong>Access</strong>, <strong>Traffic</strong> <strong>and</strong> <strong>Car</strong> <strong>Park</strong>ing <strong>Plan</strong>375.6 Site <strong>Access</strong> AnalysisThe Northern (Salvado Road), Main (Selby / Alderbury Street) <strong>and</strong> left-in / left-out accesses were analysed for thepeak hourly traffic on Winter Saturdays. The Main <strong>Access</strong> was also analysed for the peak hour (PM peak) duringweekdays. Refer to Section 4.6 for the intersection layouts. The intersection turning volumes were derived as acombination of:The development traffic based on the trip generation <strong>and</strong> distribution discussed in Section 5.2 <strong>and</strong>Section 5.5 respectively; <strong>and</strong> The background traffic discussed in Section 2.4.The intersections were analysed using SIDRA Intersection Software for the peak 15-minutes within the peakhourly flows. These flows were derived from the frequency distributions, established in 5-minute intervals, asillustrated in Figure 16. The detailed analysis results are included in Appendix B. The summary results <strong>and</strong> keyfindings are presented below.Northern <strong>Access</strong> (Salvado Road)The analysis indicated (refer to Table 8) that the Northern <strong>Access</strong> is likely to operate at, or over, capacity duringthe peak hours on Winter Saturdays. Since the <strong>Access</strong> is anticipated to be operational on dem<strong>and</strong> only (i.e. onWinter Saturdays), no analysis was done for normal weekdays.Table 7Performance summary for Northern <strong>Access</strong> (Salvado Road)TimeDayDem<strong>and</strong>Flow (vph)OverallDoSAverageDelay (s)LoSApproach /MovementWorst MovementDelay(s)Queue(m)9:30-10:30 Winter Sat 1,364 1.218 35.1 E South / RT 150.1 182.913:30-14:30 WinterSat13:30-14:30 b WinterSatStage 1 1,532 1.734 74.6 F South / RT 380.9 321.9Stage 2 1,574 1.861 83.4 F South / RT 439.7 345.8Stage 1 1,413 0.985 16.7 C South / RT 90.6 71.0Stage 2 1,455 1.057 19.3 C South / RT 114.0 86.315:00-16:00 Winter Sat 1,422 1.371 47.5 E South / RT 216.1 234.4PM Peak Weekday Free flow on Salvado Road, access to <strong>Wembley</strong> <strong>Sports</strong> <strong>Park</strong> closedNotes:b With additional traffic diverted from Salvado Road EntranceThe forecast overall Levels of Service (LoS) are E or F with a Degree of Saturation (DoS) of up to 1.734. Thecritical movement is the south approach right turn with anticipated average delays of up to 380.9 seconds. Theright turn dem<strong>and</strong>, based on the assumed traffic distribution (refer to Section 5.5), was 116, 88 <strong>and</strong> 88vphrespectively for the three peak hours analysed. It was found that, if controlled by capacity, these dem<strong>and</strong>s wouldreduce to 90, 50 <strong>and</strong> 60vph respectively; with the surplus dem<strong>and</strong>s redistributing to the Main <strong>Access</strong>. Even ifthese dem<strong>and</strong>s will not reduce as much as suggested, the oversaturated conditions are expected to be relativelyshort in duration <strong>and</strong> the associated queues are expected to dissipate relatively quickly.If the traffic would redistribute as suggested, the average delay will reduce, for example, from 380.9 seconds to90.6 seconds as shown in Table 7. The effect of traffic redistribution on the Main <strong>Access</strong> is discussed in the nextsection.Main <strong>Access</strong> (Selby Street / Alderbury Street intersection)The proposed signalised intersection at the Main <strong>Access</strong> was analysed for the peak hours during WinterSaturdays <strong>and</strong> the peak hour (PM peak) on normal weekdays. The base analysis assumed that all pedestrianphases will operate each cycle in the peak hour. Since this is unlikely to occur, analysis was also done assumingno pedestrian calls will be received during the peak hour. The likely scenario is that several calls may be receivedduring the peak hour <strong>and</strong> thus the actual results are therefore likely to be between the two sets of results.Additional analysis was also done to test the capacity of the intersection to service overflow traffic from theNorthern <strong>Access</strong>. The key results from the analysis are summarised in Table 8.T:\60218676 - <strong>Wembley</strong> PK TA\8 Issued Docs\8.1 Reports\Comprehensive <strong>Integrated</strong> <strong>Access</strong> RevF.docxRevision F - 8 February 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!