BATCHFLUX 5500 C - Forbes Marshall
BATCHFLUX 5500 C - Forbes Marshall BATCHFLUX 5500 C - Forbes Marshall
3 INSTALLATIONBATCHFLUX 5500 C3.8 Open feed or dischargeFigure 3-7: Installation before an open discharge3.9 Installation locationFigure 3-8: Installation locationMount the flow sensor in such a way that the electrode axis(X--------X) is approximately in a horizontal pipe run.20www.krohne.com03/2010 - 4000043102 - TD BATCHFLUX 5500 R02 en
BATCHFLUX 5500 CINSTALLATION 33.10 Flange deviationFigure 3-9: Mounting position and flange deviation1 L max2 L min3.11 GroundingMax. permissible deviation of pipe flange faces:L max - L min ≤ 0.5 mm / 0.02"The grounding wire should not transmit any interference voltage. Therefore do not ground anyother electrical device at the same conductor.When connecting to functional extra-low voltages (24VDC) , ensure that you use protectiveseparation (PELV) according to IEC 364/IEC 536 or VDE 0100/VDE 0106.03/2010 - 4000043102 - TD BATCHFLUX 5500 R02 enwww.krohne.com21
- Page 1 and 2: BATCHFLUX 5500 C Technical Datashee
- Page 3 and 4: BATCHFLUX 5500 CPRODUCT FEATURES 11
- Page 5 and 6: BATCHFLUX 5500 CPRODUCT FEATURES 11
- Page 7 and 8: BATCHFLUX 5500 CPRODUCT FEATURES 11
- Page 9 and 10: BATCHFLUX 5500 CTECHNICAL DATA 2Mea
- Page 11 and 12: BATCHFLUX 5500 CTECHNICAL DATA 2Ele
- Page 13 and 14: BATCHFLUX 5500 CTECHNICAL DATA 22.3
- Page 15 and 16: BATCHFLUX 5500 CTECHNICAL DATA 2DN2
- Page 17 and 18: BATCHFLUX 5500 CINSTALLATION 33.1 N
- Page 19: BATCHFLUX 5500 CINSTALLATION 33.5 H
- Page 23 and 24: BATCHFLUX 5500 CELECTRICAL CONNECTI
3 INSTALLATION<strong>BATCHFLUX</strong> <strong>5500</strong> C3.8 Open feed or dischargeFigure 3-7: Installation before an open discharge3.9 Installation locationFigure 3-8: Installation locationMount the flow sensor in such a way that the electrode axis(X--------X) is approximately in a horizontal pipe run.20www.krohne.com03/2010 - 4000043102 - TD <strong>BATCHFLUX</strong> <strong>5500</strong> R02 en