10.07.2015 Views

2013-dot-sustainable-streets-lowres

2013-dot-sustainable-streets-lowres

2013-dot-sustainable-streets-lowres

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INFRASTRUCTURE$261million stimulusallocation to NYC DOTfor transportationprojectsThe stimulus allocation was thelargest to any city in the countryand allowed New York City to createor preserve 32,000 jobsReplacement of Protective Coating onTwo Bruckner Expressway BridgesReplacement of the protective coating on two Bruckner ExpresswayBridges over the Bronx River. Lead–based paint was replaced witha lead–free protective coating. The new coating will protect thestructural steel from further corrosion, extending the useful life ofthe structures by 20 years.FEDERAL STIMULUS FUNDING FOR DOT PROJECTSCLAREMONT PKWYBRIDGE REHABPAULDING AVETotal Project Cost: $8.8 millionDirect Stimulus Funding: $8.8 millionW. 125TH STHUGH GRANTTRAFFIC CIRCLEPROTECTING COATING FOR TWOBRUCKNER EXPRESSWAY BRIDGESLINDEN PLACECOLLEGE POINT/32ND AVEELECTRIC SCREED- CITYWIDE USEQUEENS PLAZAHILLSIDE AVENUEEASTERN PARKWAYKINGSTON AVE.PROTECTIVE COATINGFOR 6 BELT PARKWAYBRIDGESCONEY ISLAND BOARDWALKROCKAWAY BOARDWALKPROTECTING COATING FOR11 S.1 RAILWAY BRIDGESSustainable Streets: <strong>2013</strong> and Beyond181

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!