INFRASTRUCTUREWILLIS AVENUE BRIDGE145TH STREET BRIDGEIn 2011, NYCDOT completelyreplaced the Willis Ave Bridge,which connects East 124th Streetin Manhattan to Willis Avenuein the Bronx, as part of a $612project. The 350 foot swing spanof the new bridge, which opens ona pivot to let marine traffic pass,was constructed in Coeymans,New York, and travelled by barge toits Harlem River home. The span’s135–nautical mile journey downthe Hudson River, through NewYork Bay, and up the East Riverincluded passage underneath14 bridges.The new bridge features adirect connection from the FDRto the northbound Major DeeganExpressway in the Bronx. It haswider lanes than the old bridge,and a combined pedestrian/bicycle pathway along its northside. The project is ongoing, asDOT completes reconstructionwork on surrounding ramps andapproaches.Willis Avenue BridgeAs part of $70 million project,the bridge was entirely closedto traffic in November 2006and the center swing span wasremoved. In February 2007,when the preparatory work wascomplete, the new 145th StreetBridge was floated up the HarlemRiver to its final destination. Thereconstructed bridge includes anew swing span, new machineryand electrical system, a newapproach roadway and spans,railing, fencing, lighting, andsignals. A new Operator’s Househas been centered and installed.145th Street BridgeSustainable Streets: 2013 and Beyond177

INFRASTRUCTUREDOT’s reconstruction project on sevenBelt Parkway Bridges will improve safetyand reliability for 150,000 drivers a dayBELT PARKWAY BRIDGESThe New York City Department of Transportation began thereconstruction of seven bridges and over the Belt Parkway in 2009.In total, the projects will cost nearly a billion dollars and improvesafety and reliability for 150,000 drivers who use the Belt everyday. The Fresh Creek Basin, Rockaway Parkway, Paerdegat Basin,Gerritsen Inlet, Mill Basin, Nostrand Avenue and the Bay RidgeAvenue Bridges are all original structures built starting in 1939. In2009, a construction contract began for three—the Belt Parkwayover Fresh Creek Basin, Rockaway Parkway, and Paerdegat Basin.Additionally, in order to mitigate wetland impacts, an offsite projectat Floyd Bennett Field within the Gateway National RecreationalArea (GNRA) was started in March 2011.Reconstruction of these bridges will improve safety and visibility.Lanes and the bike path will be wider, safety shoulders and medianbarriers will be constructed, and the roadways will be realignedto improve sight distances. NYCDOT anticipates that theseimprovements will reduce the current accident rate on this sectionof the Belt Parkway and improve highway drainage.New Paerdegat Basin Bridge in Canarsie.One of seven bridge projects along the Belt Parkway.178Chapter 13: A City of Bridges

INFRASTRUCTUREWILLIS AVENUE BRIDGE145TH STREET BRIDGEIn 2011, NYCDOT completelyreplaced the Willis Ave Bridge,which connects East 124th Streetin Manhattan to Willis Avenuein the Bronx, as part of a $612project. The 350 foot swing spanof the new bridge, which opens ona pivot to let marine traffic pass,was constructed in Coeymans,New York, and travelled by barge toits Harlem River home. The span’s135–nautical mile journey downthe Hudson River, through NewYork Bay, and up the East Riverincluded passage underneath14 bridges.The new bridge features adirect connection from the FDRto the northbound Major DeeganExpressway in the Bronx. It haswider lanes than the old bridge,and a combined pedestrian/bicycle pathway along its northside. The project is ongoing, asDOT completes reconstructionwork on surrounding ramps andapproaches.Willis Avenue BridgeAs part of $70 million project,the bridge was entirely closedto traffic in November 2006and the center swing span wasremoved. In February 2007,when the preparatory work wascomplete, the new 145th StreetBridge was floated up the HarlemRiver to its final destination. Thereconstructed bridge includes anew swing span, new machineryand electrical system, a newapproach roadway and spans,railing, fencing, lighting, andsignals. A new Operator’s Househas been centered and installed.145th Street BridgeSustainable Streets: <strong>2013</strong> and Beyond177

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!