10.07.2015 Views

2013-dot-sustainable-streets-lowres

2013-dot-sustainable-streets-lowres

2013-dot-sustainable-streets-lowres

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INFRASTRUCTUREManhattan BridgeMANHATTAN BRIDGENearly a billion dollars has beeninvested in the Manhattan Bridgeover the past few decades forreconstruction and repair. Thelatest $149 million contract beganin January 2010 and builds on theinvestment in the historic bridge.It includes the total replacementof all 628 bridge suspenders,main cable re–wrapping,replacement and upgrade of thenecklace lighting, and installationof maintenance platforms atthe bridge towers. Previousphases of the rehabilitationhave strengthened the bridge,reconstructed the roadways, thesubway tracks, and the walkway,and developed a new bikeway onthe north side.Sustainable Streets: <strong>2013</strong> and Beyond173

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!