78August 2010 8848east of the site to facilitate gravity drainage of <strong>co</strong>ntaminated run-off and leachate to thesewer.The waste disposal cells are to be developed generally ac<strong>co</strong>rding to the footprint shapesshown on the drawings. The initial development of the strip alongside the northern toe of theexisting waste site and the shaping of the surface of the existing waste disposal site up to itsmaximum height of 1495 metres above sea level would provide approximately 6 years ofoperational life.The development sequence would be from south to north. A starter berm is to be<strong>co</strong>nstructed around the perimeter of the waste site by means of a cut-to-fill operation. At thelower end of the site, on the south eastern side, the <strong>co</strong>ntaminated water and leachate would<strong>co</strong>llect into the sewer.Please refer to Appendix D7 <strong>for</strong> the current waste disposal facility and the proposed designof the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong>.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!