75August 2010 88489 WASTE DISPOSAL SITE DESIGN9.1 Constraints and factors affecting the designTaking into consideration the waste disposal need, the physical conditions of the site, anddiscussions with various ELM project personnel, there are several factors that affect thedesign philosophy adopted. These are as follows:• The Boitshepi Waste Disposal Site and the proposed extension need to comply with theMinimum Requirements for a G:L:B + waste disposal site.• The design of the waste disposal site needs to cater for waste disposal needs until thenew site has been commissioned and is operational – approximately 4 – 5 years.• The northern boundary of the site is defined by a vlei area, whilst the southern boundaryis the only area available around the site for the proposed extension. The existing wastedisposal site defines the northern boundary for the proposed extension. The existing sitepalisade fence and storm water drain define the southern boundary of the site, and this isthe ultimate extent that the site can be extended.• The existing waste body does not have a liner however this portion of the site isunderlain by clay soils. The soils on the site for the proposed extension however are notsuitable for use in the waste disposal site liner construction. The liner design is thereforebased on a geocomposite waste disposal site liner.• The design of extension of the site must be integrated with the closure and capping ofthe existing waste disposal site in terms of liner and drainage.• The design must make provision for the sequential phased development of the wastedisposal site, such that leachate flows from the lowest point of the waste disposal sitecell can discharge into the sewer under gravity.9.2 General site layoutBased on the aforementioned constraints and factors, the overall layout of the BoitshepiWaste Disposal Site has been developed as shown in the Figure 26. The arrangement of thevarious facilities (already existing) is also illustrated in the drawings. The designs providedfor in this section are based on the preferred alternative, that is, alternative 2 with a 50 metrebuffer zone.The entrance to the site would remain in its current position at the north western corner ofthe existing waste disposal site throughout operations. The existing gravel access roadwould continue to be used for waste disposal to the site. The existing site office andweighbridge would also continue to be used for operations.ZITHOLELE CONSULTING
76August 2010 8848Figure 24: Existing site layout.ZITHOLELE CONSULTING
- Page 40 and 41: August 2010 25 8848• A descriptio
- Page 42 and 43: August 2010 27 8848(KV3 Engineers a
- Page 44 and 45: August 2010 29 88485 PROJECT DESCRI
- Page 46 and 47: August 2010 31 8848Capping of the W
- Page 48 and 49: August 2010 33 88485.6 Overall EIA
- Page 50 and 51: August 2010 35 8848Construction of
- Page 52 and 53: August 2010 37 8848There are differ
- Page 54 and 55: August 2010 39 88486 TECHNOLOGY REV
- Page 56 and 57: August 2010 418848Figure 10: Boitsh
- Page 58 and 59: August 2010 4388487 BASELINE RECEIV
- Page 60 and 61: August 2010 458848• Soil depth;
- Page 62 and 63: 47August 2010 8848Figure 12: Soil T
- Page 64 and 65: August 2010 4988487.1.3 Drainage Fe
- Page 66 and 67: August 2010 518848Figure 15: Upper
- Page 68 and 69: 53August 2010 8848Figure 16: Topogr
- Page 70 and 71: August 2010 558848Soweto Highveld G
- Page 72 and 73: August 2010 578848Figure 18: Alien
- Page 74 and 75: 59August 2010 8848Species ListThe f
- Page 76 and 77: 61August 2010 8848Common Name Scien
- Page 78 and 79: 63August 2010 8848five decades ago
- Page 80 and 81: 65August 2010 8848steel industry, I
- Page 82 and 83: 67August 2010 88488 WASTE LICENSE A
- Page 84 and 85: 69August 2010 8848Waste disposal si
- Page 86 and 87: 71August 2010 8848Table 13 below il
- Page 88 and 89: 73August 2010 8848continue to monit
- Page 92 and 93: 77August 2010 88489.2.1 Extension o
- Page 94 and 95: 79August 2010 8848Figure 26: Site l
- Page 96 and 97: 81August 2010 884810 IMPACT ASSESSM
- Page 98 and 99: 83August 2010 884810.3 Duration Sca
- Page 100 and 101: 85August 2010 884811 IMPACT ASSESSM
- Page 102 and 103: 87August 2010 8848• Link the exte
- Page 104 and 105: 89August 2010 8848Type ofImpactCumu
- Page 106 and 107: 91August 2010 8848Figure 28: Piezom
- Page 108 and 109: 93August 2010 884811.1.4 Surface wa
- Page 110 and 111: 95August 2010 8848seepage of ground
- Page 112 and 113: 97August 2010 8848Table 29: Impact
- Page 114 and 115: 99August 2010 8848Table 30: Impact
- Page 116 and 117: 101August 2010 8848• As a minimum
- Page 118 and 119: 103August 2010 8848Table 32: Impact
- Page 120 and 121: 105August 2010 8848material. Not on
- Page 122 and 123: 107August 2010 8848Safety• Access
- Page 124 and 125: 109August 2010 8848Type ofImpactCum
- Page 126 and 127: 111August 2010 884811.2.2 Topograph
- Page 128 and 129: 113August 2010 8848It is understood
- Page 130 and 131: 115August 2010 8848Additional Impac
- Page 132 and 133: 117August 2010 8848Cumulative Impac
- Page 134 and 135: 119August 2010 8848Additional Impac
- Page 136 and 137: 121August 2010 8848TrafficDuring th
- Page 138 and 139: 123August 2010 884811.3 Decommissio
76August 2010 8848Figure 24: Existing site layout.ZITHOLELE CONSULTING