- Page 1: August 2010Authorisation PhaseENVIR
- Page 4: August 2010 iii 8848consultation wi
- Page 9 and 10: August 2010 viii 8848Adherence to R
- Page 11 and 12: August 2010 x 88489.2 General site
- Page 13 and 14: August 2010 xii 8848LIST OF TABLEST
- Page 15 and 16: August 2010 xiv 8848LIST OF APPENDI
- Page 17 and 18: August 2010 2 8848However, during t
- Page 19 and 20: August 2010 4 88481.2 Purpose and O
- Page 21 and 22: August 2010 6 8848The area also com
- Page 23 and 24: August 2010 8 8848Section 24C (2) o
- Page 25 and 26: August 2010 10 8848• The particip
- Page 27 and 28: August 2010 12 8848The NEMA can be
- Page 29 and 30: August 2010 14 8848For Category “
- Page 31 and 32: August 2010 16 8848d) To provide fo
- Page 33 and 34: August 2010 18 88483 ENVIRONMENTAL
- Page 35 and 36: August 2010 20 8848Objectives of pu
- Page 37 and 38: August 2010 22 8848Table 1: Newspap
- Page 39 and 40: August 2010 24 8848Table 4: List of
- Page 41 and 42: August 2010 26 8848Public participa
- Page 43 and 44: August 2010 28 88484 ISSUES AND CON
- Page 45 and 46: August 2010 30 8848The current use
- Page 47 and 48: August 2010 32 88485.5 Major Activi
- Page 49 and 50: August 2010 34 8848• Site prepara
- Page 51 and 52: August 2010 36 8848CEF (Pty) Ltd, a
- Page 53 and 54: August 2010 38 8848registration num
- Page 55 and 56:
August 2010 40 8848The approval let
- Page 57 and 58:
August 2010 428848Alternative 1In t
- Page 59 and 60:
August 2010 448848the effect of kee
- Page 61 and 62:
46August 2010 8848Figure 11: Region
- Page 63 and 64:
48August 2010 8848Figure 13: Site s
- Page 65 and 66:
August 2010 508848siltstone, mudsto
- Page 67 and 68:
August 2010 5288487.1.4 Topography
- Page 69 and 70:
August 2010 5488487.1.5 Terrestrial
- Page 71 and 72:
August 2010 568848In addition to th
- Page 73 and 74:
58August 2010 8848Figure 20: Vegeta
- Page 75 and 76:
60August 2010 8848SensitivitiesA de
- Page 77 and 78:
62August 2010 8848SensitivitiesSens
- Page 79 and 80:
64August 2010 8848Site DescriptionT
- Page 81 and 82:
66August 2010 88488% of the populat
- Page 83 and 84:
68August 2010 88488.2.1 Waste TypeT
- Page 85 and 86:
70August 2010 8848Sub-totalTOTAL- 7
- Page 87 and 88:
72August 2010 88488.3 Existing Foot
- Page 89 and 90:
74August 2010 8848Figure 23: Boitsh
- Page 91 and 92:
76August 2010 8848Figure 24: Existi
- Page 93 and 94:
78August 2010 8848east of the site
- Page 95 and 96:
80August 2010 8848Figure 27: Cross
- Page 97 and 98:
82August 2010 8848Table 15: Descrip
- Page 99 and 100:
84August 2010 884810.6 Quantitative
- Page 101 and 102:
86August 2010 8848pollution prevent
- Page 103 and 104:
88August 2010 8848therefore rated a
- Page 105 and 106:
90August 2010 8848ran for 8.5 minut
- Page 107 and 108:
92August 2010 8848Additional Impact
- Page 109 and 110:
94August 2010 8848• A storm water
- Page 111 and 112:
96August 2010 8848indicative of the
- Page 113 and 114:
98August 2010 8848Additional Impact
- Page 115 and 116:
100August 2010 8848Disposal Site, i
- Page 117 and 118:
102August 2010 8848is to be develop
- Page 119 and 120:
104August 2010 8848Additional Impac
- Page 121 and 122:
106August 2010 8848Traffic• There
- Page 123 and 124:
108August 2010 8848impact will be L
- Page 125 and 126:
110August 2010 8848Additional Impac
- Page 127 and 128:
112August 2010 884811.2.3 Groundwat
- Page 129 and 130:
114August 2010 8848Cumulative Impac
- Page 131 and 132:
116August 2010 8848Mitigation Measu
- Page 133 and 134:
118August 2010 8848• Landfill gas
- Page 135 and 136:
120August 2010 884811.2.10 Social E
- Page 137 and 138:
122August 2010 8848Type ofImpactAdd
- Page 139 and 140:
124August 2010 884811.3.2 Topograph
- Page 141 and 142:
126August 2010 8848Table 46: Impact
- Page 143 and 144:
128August 2010 8848• Ensure that
- Page 145 and 146:
130August 2010 884811.3.8 Air Quali
- Page 147 and 148:
132August 2010 8848Nuisance and Hea
- Page 149 and 150:
134August 2010 884812 IMPACT SUMMAR
- Page 151 and 152:
136August 2010 8848BIO-PHYSICALSOCI