10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 34 8848• <strong>Site</strong> preparation and vegetation clearance <strong>for</strong> <strong>co</strong>ntractor’s camp;• Erection of camp sites <strong>for</strong> the <strong>co</strong>ntractors;• Construction of surface drainage and storm water diversion drains;• Construction of the liner;• Construction of a leachate <strong>co</strong>llection system;• Construction of a leakage detection system;• Construction of gas management systems (not applicable at this stage); and• <strong>Site</strong> preparation and <strong>co</strong>mmissioning.<strong>Site</strong> preparation and vegetation clearance is undertaken <strong>for</strong> <strong>co</strong>ntractor’s camp in order tofacilitate <strong>co</strong>nstruction.An area will be cleared <strong>for</strong> the siting of a <strong>co</strong>ntractor’s camp to facilitate <strong>co</strong>nstruction. Thisarea will be chosen to have the least environmental impacts which are easily mitigated andwill be rehabilitated as per the EMP requirements post <strong>co</strong>nstruction.Erection of camp sites <strong>for</strong> the <strong>co</strong>ntractorsThe <strong>co</strong>ntractor’s camp will be located on the site within the palisade fencing and there<strong>for</strong>e noadditional fencing will be required. <strong>Site</strong> establishment shall take place in an orderly mannerand all amenities shall be installed at the camp site (if applicable) be<strong>for</strong>e the main work<strong>for</strong>cemoves onto site.Construction of surface drainage and storm water diversion drains.This includes the separation of unpolluted from polluted surface water and the <strong>co</strong>ntainmentof polluted water on site in impoundments. Also where leachate is generated, it must be<strong>co</strong>ntained separately from water which is only slightly polluted through <strong>co</strong>ntact with thewaste.Construction of the linerThis is a layer of low permeability material placed beneath a waste disposal site anddesigned to direct leachate to a <strong>co</strong>llection drain or sump, or to <strong>co</strong>ntain leachate. It may<strong>co</strong>mprise natural materials, synthetic materials, or a <strong>co</strong>mbination thereof (refer to Section5.3).ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!