August 2010 33 88485.6 Overall EIA Project ScheduleThe primary milestones <strong>for</strong> the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong> Project (prior and through topost <strong>co</strong>nstruction) are described in Table 7 below.Table 7: Primary milestones of the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong>.MILESTONESFinal S<strong>co</strong>ping Report 20 February 2009Undertake Specialist Studies January - March 2010Draft EIR and EMP April 2010Stakeholder Engagement on EIR / EMP May - June 2010Finalise EIR and EMP June 2010Submission to Relevant Authorities June / July 2010Environmental Authorisation October / November 2010Appeal PeriodConstruction (including EMP Auditing)DATETo be <strong>co</strong>nfirmed after the Environmental AuthorisationTo be <strong>co</strong>nfirmed after the Environmental Authorisation5.7 Description of the Development Activities - Extension5.7.1 The Pre-Construction PhaseEnvironmental Authorisation and Waste LicenceIf the <strong>co</strong>mpetent authority decides to grant EA, then an EA will be issued <strong>co</strong>mplying withRegulation 38 of the NEMA Regulations, 2006 in the name of the applicant. Once an EA isissued, a Waste Licence can also be issued in order <strong>for</strong> the proposed project to proceed.Should both the EA and Waste License be received, and the appeal process lapses the ELMmay <strong>co</strong>mmence with <strong>co</strong>nstruction towards extension.Appointment of ContractorAfter a tendering process, the ELM will appoint a <strong>co</strong>nstruction <strong>co</strong>ntractor.Construction ScheduleThe primary milestones <strong>for</strong> the <strong>co</strong>nstruction <strong>for</strong> the extension of <strong>Boitshepi</strong> Waste Disposal<strong>Site</strong> are described below.5.7.2 Construction PhaseOnce a positive EA and waste license is obtained, <strong>co</strong>nstruction <strong>for</strong> the extension of the<strong>Boitshepi</strong> Waste Disposal <strong>Site</strong> will be undertaken over a period to be determined by themunicipality. The <strong>co</strong>nstruction phase of the development will involve the following aspects:ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!