10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 31 8848Capping of the Waste Disposal <strong>Site</strong>There is no permit / licence <strong>for</strong> the existing waste site. However the cells of the existingwaste disposal site that have reached capacity must be capped during the same period thatthe extension is lined. The type of capping proposed <strong>for</strong> the site is in line with the MinimumRequirements <strong>for</strong> a GLB + waste disposal facility (Figure 6).As stated in the Minimum Requirements the design of <strong>co</strong>vers is highly dependent on sitespecificcircumstances, e.g., nature of waste (wet, dry, putrescible). Although the primaryfunction of the <strong>co</strong>ver is to keep water out of the waste body, the <strong>co</strong>ver design will also beaffected by the <strong>co</strong>ntainment and gas management philosophy adopted and the preferredmaterials and technology (e.g., clay, GCLs and FMLs) <strong>for</strong> the given situation. Cover designsshould be based on the figure below. However, at the discretion of the Competent Authority,<strong>co</strong>mponents and <strong>co</strong>nfigurations may be varied.Figure 6: Capping cross section <strong>for</strong> a GLB+ waste disposal site as per the MinimumRequirements.5.4 Services and InfrastructureThe waste disposal site already has the following auxiliary services and infrastructurespresent on site:• Access and Roads;• Weighbridge;• Fencing;• Water;• Electricity;• Staff facilities; and• <strong>Site</strong> office and fuel storage area.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!