FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za
FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za
August 2010 27 8848(KV3 Engineers and Zitholele Consulting). At the meeting it was agreed by all parties that theFinal Environmental Impact Reports of both EIAs will be submitted to GDARD during midAugust 2010. The GDARD will then request comments from DWA on matters pertaining to thedepartment. The DWA expressed their satisfaction with the DEIR of this EIA as they havereceived a copy thereof during a meeting that was arranged between Zitholele Consulting andMr Pather to solicit DWA’s comments on the proposed project.Final Environmental Impact Report and Environmental Management PlanThe Final EIR and EMP has been updated with additional issues raised by I&APs and couldcontain new information that was generated as a result of the public review process. The FinalEIR and EMP is being submitted to the Authorities (GDARD) and key I&APs, and to thoseindividuals who specifically requested a copy. I&APs have been notified of the availability ofthe final reports in a letter that was distributed to all stakeholders.Announce authorities’ decisions on Environmental AuthorisationOnce the GDARD has made a decision for the proposed project, stakeholders will be notifiedaccording to the requirements set by the GDARD in their authorisation letter. A letter will befaxed and emailed to the list of stakeholders and those without email or fax facilities will becontacted telephonically.3.2.3 AppealA Notice of Intent to appeal on the EA can be lodged with the GDARD by either the proponentor a stakeholder within stipulated time period (within an EA) following the issue of the EA. Anappeal must be submitted to the relevant department within 30 days of lodging the Notice ofIntent to appeal. The appeal should describe the grounds for appeal and must besubstantiated with evidence.ZITHOLELE CONSULTING
August 2010 28 88484 ISSUES AND CONCERNS RAISEDIssues and concerns raised during the EIA have been documented in the IRR (SeeAppendix B4).4.1 AuthoritiesTo date, the following Authorities have raised issues and concerns regarding the proposedextension of the Boitshepi Waste Disposal Site and the identified alternatives.• Emfuleni Local Municipality.4.2 StakeholdersThe issues and concerns documented to date have been tabulated in the IRR (AppendixB4) and have been summarised into the following board categories:• The type of materials being disposed;• Social Issues;• Illegal Dumping;• Ecological Issues;• Economic;• Access to the site; and• Air quality.ZITHOLELE CONSULTING
- Page 1: August 2010Authorisation PhaseENVIR
- Page 4: August 2010 iii 8848consultation wi
- Page 8 and 9: August 2010 vii 8848GNRGPSHHDIH:hH:
- Page 10 and 11: August 2010 ix 8848SECTIONTABLE OF
- Page 12 and 13: August 2010 xi 8848LIST OF FIGURESF
- Page 14 and 15: August 2010 xiii 8848Table 31: Impa
- Page 16 and 17: August 2010 1 88481 INTRODUCTIONAnt
- Page 18 and 19: August 2010 3 8848Figure 1: Locatio
- Page 20 and 21: August 2010 5 88481.5 The Project T
- Page 22 and 23: August 2010 7 8848EAP Contact Detai
- Page 24 and 25: August 2010 9 88482 LEGAL REQUIREME
- Page 26 and 27: August 2010 11 8848On 1 May 2009, N
- Page 28 and 29: August 2010 13 8848• The role of
- Page 30 and 31: August 2010 15 8848• To provide a
- Page 32 and 33: August 2010 17 8848• Lay down gen
- Page 34 and 35: August 2010 19 8848Application Form
- Page 36 and 37: August 2010 21 8848APPLICATION /REG
- Page 38 and 39: August 2010 23 8848were received as
- Page 40 and 41: August 2010 25 8848• A descriptio
- Page 44 and 45: August 2010 29 88485 PROJECT DESCRI
- Page 46 and 47: August 2010 31 8848Capping of the W
- Page 48 and 49: August 2010 33 88485.6 Overall EIA
- Page 50 and 51: August 2010 35 8848Construction of
- Page 52 and 53: August 2010 37 8848There are differ
- Page 54 and 55: August 2010 39 88486 TECHNOLOGY REV
- Page 56 and 57: August 2010 418848Figure 10: Boitsh
- Page 58 and 59: August 2010 4388487 BASELINE RECEIV
- Page 60 and 61: August 2010 458848• Soil depth;
- Page 62 and 63: 47August 2010 8848Figure 12: Soil T
- Page 64 and 65: August 2010 4988487.1.3 Drainage Fe
- Page 66 and 67: August 2010 518848Figure 15: Upper
- Page 68 and 69: 53August 2010 8848Figure 16: Topogr
- Page 70 and 71: August 2010 558848Soweto Highveld G
- Page 72 and 73: August 2010 578848Figure 18: Alien
- Page 74 and 75: 59August 2010 8848Species ListThe f
- Page 76 and 77: 61August 2010 8848Common Name Scien
- Page 78 and 79: 63August 2010 8848five decades ago
- Page 80 and 81: 65August 2010 8848steel industry, I
- Page 82 and 83: 67August 2010 88488 WASTE LICENSE A
- Page 84 and 85: 69August 2010 8848Waste disposal si
- Page 86 and 87: 71August 2010 8848Table 13 below il
- Page 88 and 89: 73August 2010 8848continue to monit
- Page 90 and 91: 75August 2010 88489 WASTE DISPOSAL
August 2010 27 8848(KV3 Engineers and <strong>Zitholele</strong> Consulting). At the meeting it was agreed by all parties that theFinal Environmental Impact Reports of both EIAs will be submitted to GDARD during midAugust 2010. The GDARD will then request <strong>co</strong>mments from DWA on matters pertaining to thedepartment. The DWA expressed their satisfaction with the DEIR of this EIA as they havereceived a <strong>co</strong>py thereof during a meeting that was arranged between <strong>Zitholele</strong> Consulting andMr Pather to solicit DWA’s <strong>co</strong>mments on the proposed project.Final Environmental Impact Report and Environmental Management PlanThe Final EIR and EMP has been updated with additional issues raised by I&APs and <strong>co</strong>uld<strong>co</strong>ntain new in<strong>for</strong>mation that was generated as a result of the public review process. The FinalEIR and EMP is being submitted to the Authorities (GDARD) and key I&APs, and to thoseindividuals who specifically requested a <strong>co</strong>py. I&APs have been notified of the availability ofthe final reports in a letter that was distributed to all stakeholders.Announce authorities’ decisions on Environmental AuthorisationOnce the GDARD has made a decision <strong>for</strong> the proposed project, stakeholders will be notifiedac<strong>co</strong>rding to the requirements set by the GDARD in their authorisation letter. A letter will befaxed and emailed to the list of stakeholders and those without email or fax facilities will be<strong>co</strong>ntacted telephonically.3.2.3 AppealA Notice of Intent to appeal on the EA can be lodged with the GDARD by either the proponentor a stakeholder within stipulated time period (within an EA) following the issue of the EA. Anappeal must be submitted to the relevant department within 30 days of lodging the Notice ofIntent to appeal. The appeal should describe the grounds <strong>for</strong> appeal and must besubstantiated with evidence.ZITHOLELE CONSULTING