10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

August 2010 25 8848• A description of the methodology followed and being followed <strong>for</strong> the stakeholderengagement process;• The Issues and Response Report and Stakeholder Database;• A summary of the methodology used in determining the significance of potential impacts;• A description and <strong>co</strong>mparative assessment of all alternatives identified during theenvironmental impact assessment process;• A summary of the findings of the specialist studies;• A detailed assessment of all identified potential impacts;• A list of the assumptions, uncertainties and gaps in knowledge;• An opinion by the <strong>co</strong>nsultant as to whether the development is suitable <strong>for</strong> approval withinthe proposed site;• An EMP that <strong>co</strong>mplies with regulation 34 of the NEMA ,Act 107 of 1998; and• Copies of all specialist reports appended to the EIR.Environmental Management PlanThe Environmental Management Plan highlights the most significant potential impacts andprovides mitigation measures <strong>for</strong> these impacts to ensure that the risk of impact is reducedand that the activity generating the impact is suitably managed. The EMP includes:• Re<strong>co</strong>mmended management plans and detailed measures <strong>for</strong> environmental objectivesidentified to manage impacts, in order to facilitate the monitoring and <strong>co</strong>ntrol of the activitygenerating the impact; and• The identification of the responsible person <strong>for</strong> the mitigation and monitoring of impacts.3.2.2 Public participation during the Impact AssessmentObjectives of Public Participation in the Impact Assessment PhaseThe objectives of public participation in an EIA are to provide sufficient and accessiblein<strong>for</strong>mation to I&APs in an objective manner so as to:• During Impact Assessment:- Verify that their issues have been <strong>co</strong>nsidered either by the EIA Specialist Studies, orelsewhere.- Comment on the findings of the EIA, including the measures that have been proposedto enhance positive impacts and reduce or avoid negative ones.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!