10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 24 8848Table 4: List of public places where the Draft S<strong>co</strong>ping Report was made available.Place Contact Person TelephoneVereeniging Public Library Ms Mabosego 016 – 450 3029Vanderbijlpark Public Library Mrs Marina van Wyk 016 – 950 5252Boipatong Public Library Mrs Maria Aphane 016 – 988 3738Final S<strong>co</strong>ping ReportThe Final SR was updated to include any additional issues raised by I&APs and there<strong>for</strong>e<strong>co</strong>ntained any new in<strong>for</strong>mation that was generated as a result of this EIA process. The FinalSR was distributed to the Authorities (GDARD) and key I&APs, and to those individuals whospecifically requested a <strong>co</strong>py. I&APs were notified of the availability of the Final SR.3.2 Impact Assessment PhaseAs with the S<strong>co</strong>ping Phase, the Impact Assessment Phase <strong>co</strong>nsists of a technical process anda public participation process. These processes are explained separately below.3.2.1 Technical ProcessSpecialist StudiesIn the Impact Assessment Phase of the EIA, specialist studies were <strong>co</strong>nducted to assess thepotential positive and negative impacts of the proposed project, and to re<strong>co</strong>mmendappropriate measures to enhance positive impacts and avoid or reduce negative ones. Thespecialist reports are appended to this Final EIR as Appendix C.Draft Environmental Impact Report and Environmental Management PlanThe Draft EIR was prepared with in<strong>for</strong>mation and issues identified during the S<strong>co</strong>ping Phaseactivities, <strong>co</strong>mments from the GDARD and other <strong>co</strong>mmenting authorities and the findings fromthe specialist studies. Appended to the Draft EIR was the Draft Environmental ManagementPlan (Appendix E).The Draft EIR included:• A detailed description of the proposed development;• A description of the need and desirability of the proposed development and the identifiedpotential alternatives to the proposed activity;• A description of the environment that may be affected by the activity and the manner inwhich physical, biological, social, e<strong>co</strong>nomic and cultural aspects of the environment maybe affected by the proposed development;ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!