10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 23 8848were received as part of the s<strong>co</strong>ping phase process. The issues and <strong>co</strong>mments raised duringthe public review period of the Draft S<strong>co</strong>ping Report were added to the report as Version 2 ofthe IRR which was appended to the FSR. The <strong>co</strong>ntributions made by I&APs wereacknowledged in writing (Appendix B4).Draft S<strong>co</strong>ping ReportThe purpose of the review of the Draft SR was to enable I&APs to verify that their<strong>co</strong>ntributions had been captured, understood and <strong>co</strong>rrectly interpreted, and to raise furtherissues. At the end of S<strong>co</strong>ping, the issues identified by I&APs and by the environmentaltechnical specialists, were used to define the ToR <strong>for</strong> the Specialist Studies that were<strong>co</strong>nducted during this Impact Assessment Phase of the EIA. A period of four weeks wasavailable <strong>for</strong> public review of the Draft SR (3 November 2008 to 28 November 2008).In addition to media advertisements and site notices to announce the opportunity to participatein the EIA, the opportunity <strong>for</strong> public review was announced as follows:• In newspaper advertisements published to advertise the public review period; and• In a letter sent out on 27 October 2008, and addressed personally to all individuals andorganisations on the stakeholder database (Appendix B5).Table 3: Newspapers in which advertisements were placed <strong>for</strong> public review of the DraftS<strong>co</strong>ping Report.PublicationPublication DateVaal Weekblad 3 – 7 November 2008Vaal Weekly 3 – 7 November 2008Vereeniging Ster 3 – 7 November 2008Vaal Vision 3 – 7 November 2008Vanderbijlpark Ster 3 – 7 November 2008Sasolburg Ster 3 – 7 November 2008The Draft SR, including the IRR Version 1, was distributed <strong>for</strong> <strong>co</strong>mment as follows:• Left in public places in the project area. The public places where documents were madeavailable are listed in Table 4 below;• Mailed to key stakeholders (Appendix B3);• Mailed to I&APs who requested the report;• Copies were made available at the public meeting.I&APs <strong>co</strong>uld <strong>co</strong>mment on the report in various ways, such as <strong>co</strong>mpleting the <strong>co</strong>mment sheetthat ac<strong>co</strong>mpanied the report, at the public meeting that was held on 13 November 2009 andsubmitting individual <strong>co</strong>mments in writing or by email.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!