10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 22 8848Table 1: Newspapers in which the proposed project was announced.PublicationPublication DateVaal Weekblad 27 August 2008Vaal Weekly 27 August 2008Vereeniging Ster 27 August 2008Vaal Vision 28 August 2008Vanderbijlpark Ster 27 August 2008Sasolburg Ster 27 August 2008• Notice boards were placed during August 2008 at <strong>co</strong>nspicuous places (Figure 4), atvarious public places, and on Bakwena Road. <strong>Site</strong> notices were placed prominently toinvite stakeholder participation. (Appendix B2).Figure 4: <strong>Site</strong> notice boards were put up in the study area.Obtaining <strong>co</strong>mments and <strong>co</strong>ntributionsThe following opportunities were provided during S<strong>co</strong>ping <strong>for</strong> I&APs to provide <strong>co</strong>mment:• Completing and returning registration/<strong>co</strong>mment sheets in which space was provided <strong>for</strong><strong>co</strong>mment;• Providing <strong>co</strong>mment telephonically or by email to the public participation office; and• Attending the stakeholder meeting of 13 November 2008 that was widely advertised (seetable below) and raising <strong>co</strong>mments there.Issues relevant to the current project <strong>co</strong>nfiguration were carried <strong>for</strong>ward into this ImpactAssessment Phase.Table 2: A stakeholder meeting was advertised as part of the public review period of theDraft S<strong>co</strong>ping Report.DateThursday, 13 November 2008VenueVanderbijlpark LibraryThe minutes of the public meetings are attached to this Final EIR in the <strong>for</strong>m of an IRR.Issues and Response Report and AcknowledgementsThe issues raised during the announcement, were captured in an IRR Version 1, which wasappended to the DSR. This report was updated to include additional I&AP <strong>co</strong>ntributions thatZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!