10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

August 2010 19 8848Application Forms and Landowner <strong>co</strong>nsentThe EIA application <strong>for</strong>m (Appendix A1) <strong>for</strong> the proposed project was submitted to theGDARD on 10 April 2008. (Refer to Appendix A6). Acknowledgement of receipt of theapplication <strong>for</strong>m by the GDARD was received on 8 July 2008.<strong>Site</strong> VisitsMonthly site visits were <strong>co</strong>nducted by Mrs Jacqui Hex from ZC and Mr Elias Barnard fromGAA from April 2007 to November 2009 in order to identify all environmental aspects to beassessed during the EIA phase.Draft S<strong>co</strong>ping Report and Plan of Study <strong>for</strong> EIAThe Draft S<strong>co</strong>ping Report (SR) was prepared based on the in<strong>for</strong>mation gathered and issuesidentified during the S<strong>co</strong>ping Phase activities. The PoS <strong>for</strong> EIA including the Terms ofReference (ToR) <strong>for</strong> the envisaged specialist studies were also included in the Final S<strong>co</strong>pingReportFinal S<strong>co</strong>ping Report and Plan of Study <strong>for</strong> EIAThe Draft SR and PoS were updated based on <strong>co</strong>mments obtained from I&APs and were<strong>co</strong>nsolidated into the Final S<strong>co</strong>ping Report and the PoS <strong>for</strong> the EIA. This report was submittedto the GDARD <strong>for</strong> acceptance and approval to proceed was received on the 9 April 2009(Appendix A7).3.1.2 Public Participation ProcessPublic participation is an essential and legislative requirement in an EIA processes. Theprinciples that demand <strong>co</strong>mmunication with society at large are best embodied in theprinciples of the NEMA (Act 107 of 1998, Chapter 1), South Africa’s overarchingenvironmental law. In addition, Section 24 (5), Regulation 56 of GN R385 under the NEMA,guides the PPP that is required <strong>for</strong> an EIA. The NEM:WA, Part 2, Section 73 also makesprovision <strong>for</strong> public participation.The PPP <strong>for</strong> this project has been designed and undertaken to satisfy the requirements laiddown in the above legislation. Figure 3 below provides an overview of the EIA technical andPP processes, and shows how issues and <strong>co</strong>ncerns raised by the public are used to in<strong>for</strong>mthe technical investigations of the EIA at various milestones during the process. This sectionof the report highlights the key elements of the PPP to date.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!