10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 8 8848Section 24C (2) of the NEMA. GDARD is the relevant provincial department <strong>for</strong> lodging thisapplication <strong>for</strong> EA.1.6 Project ProgressThe S<strong>co</strong>ping Phase of this project has been <strong>co</strong>mpleted, this included the following:• Pre-application <strong>co</strong>nsultation with relevant stakeholders and authorities;• Completion and submission of the relevant EIA Application documentation;• Compilation, submission, and approval of the Plan of Study (PoS) <strong>for</strong> S<strong>co</strong>ping;• Placement of advertisements;• Compilation and distribution of a Background In<strong>for</strong>mation Document (BID);• Hosting a public meeting;• Public review period and Issues and Response Report (IRR);• Compilation of a Draft S<strong>co</strong>ping Report (Draft SR); and• Compilation, submission and approval of the Final S<strong>co</strong>ping Report (Final SR) and PoS<strong>for</strong> EIA.This phase of the project is the Impact Assessment Phase, where the following is required tobe undertaken:• Specialist Studies;• Compilation of a Draft Environmental Impact Report (Draft EIR) and Draft EnvironmentalManagement Plan (Draft EMP);• Compilation of waste related documentation as required <strong>for</strong> the waste licenseapplication;• Public review period and Issues and Response Report; and• Compilation, submission and approval of the Final Environmental Impact Report (FinalEIR) and Final Environmental Management Plan (Final EMP) <strong>for</strong> EIA.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!