10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

August 2010 4 88481.2 Purpose and Overview of the Proposed ProjectThe main purpose of this project is to obtain Environmental Authorisation (EA) and a WasteLicense <strong>for</strong> the proposed extension with view of closure <strong>for</strong> the <strong>Boitshepi</strong> Waste Disposal<strong>Site</strong>. The site is reaching capacity and as such needs to be extended and ultimately closed.The ELM has appointed <strong>Zitholele</strong> Consulting, an independent <strong>co</strong>mpany, to undertake thea<strong>for</strong>ementioned processes.The site cannot be closed until a new site has been authorised and licensed in line withlegislative requirements. Kwezi V3 Engineers (KV3) in association with Masakhe IsizweEngineers (Pty) Ltd were appointed by the ELM in February 2008 (3 year <strong>co</strong>ntract) to site,obtain EA, design, establish and license a new GLB + waste disposal site in ELM. Onceoperational, this new site will replace the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong>.1.3 Context of this ReportThis report <strong>co</strong>nstitutes the Final Environmental Impact Report (Final EIR), a key <strong>co</strong>mponentof the EA Process <strong>for</strong> the extension with view of closure of the <strong>Boitshepi</strong> Waste Disposal<strong>Site</strong>.1.4 Objectives of the Impact Assessment PhaseThis report addresses the requirements <strong>for</strong> the Impact Assessment Phase <strong>for</strong> theEnvironmental Impact Assessment (EIA) as outlined in the regulations as promulgated inApril 2006 in terms of the National Environmental Management Act, (NEMA) (No 107 of1998) which became effective on 1 July 2006. The aim of this Final EIR is to:• Provide in<strong>for</strong>mation to the authorities as well as Interested and Affected Parties (I&APs)on the proposed project; including details on the:- Alternatives that are being <strong>co</strong>nsidered;- Receiving environment; and- Assessing and ranking methodology.• Indicate how I&APs have been af<strong>for</strong>ded the opportunity to <strong>co</strong>ntribute to the project andverify that the issues they raised to date have been <strong>co</strong>nsidered;• Provide proposed mitigation measures in order to minimise negative impacts andenhance positive impacts; and• Present the findings of the Impact Assessment Phase in a manner that facilitatesdecision-making by the relevant authorities.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!