August 2010 3 8848Figure 1: Location of the Boitshepi Waste Disposal Site.ZITHOLELE CONSULTING
August 2010 4 88481.2 Purpose and Overview of the Proposed ProjectThe main purpose of this project is to obtain Environmental Authorisation (EA) and a WasteLicense for the proposed extension with view of closure for the Boitshepi Waste DisposalSite. The site is reaching capacity and as such needs to be extended and ultimately closed.The ELM has appointed Zitholele Consulting, an independent company, to undertake theaforementioned processes.The site cannot be closed until a new site has been authorised and licensed in line withlegislative requirements. Kwezi V3 Engineers (KV3) in association with Masakhe IsizweEngineers (Pty) Ltd were appointed by the ELM in February 2008 (3 year contract) to site,obtain EA, design, establish and license a new GLB + waste disposal site in ELM. Onceoperational, this new site will replace the Boitshepi Waste Disposal Site.1.3 Context of this ReportThis report constitutes the Final Environmental Impact Report (Final EIR), a key componentof the EA Process for the extension with view of closure of the Boitshepi Waste DisposalSite.1.4 Objectives of the Impact Assessment PhaseThis report addresses the requirements for the Impact Assessment Phase for theEnvironmental Impact Assessment (EIA) as outlined in the regulations as promulgated inApril 2006 in terms of the National Environmental Management Act, (NEMA) (No 107 of1998) which became effective on 1 July 2006. The aim of this Final EIR is to:• Provide information to the authorities as well as Interested and Affected Parties (I&APs)on the proposed project; including details on the:- Alternatives that are being considered;- Receiving environment; and- Assessing and ranking methodology.• Indicate how I&APs have been afforded the opportunity to contribute to the project andverify that the issues they raised to date have been considered;• Provide proposed mitigation measures in order to minimise negative impacts andenhance positive impacts; and• Present the findings of the Impact Assessment Phase in a manner that facilitatesdecision-making by the relevant authorities.ZITHOLELE CONSULTING
- Page 1: August 2010Authorisation PhaseENVIR
- Page 4: August 2010 iii 8848consultation wi
- Page 8 and 9: August 2010 vii 8848GNRGPSHHDIH:hH:
- Page 10 and 11: August 2010 ix 8848SECTIONTABLE OF
- Page 12 and 13: August 2010 xi 8848LIST OF FIGURESF
- Page 14 and 15: August 2010 xiii 8848Table 31: Impa
- Page 16 and 17: August 2010 1 88481 INTRODUCTIONAnt
- Page 20 and 21: August 2010 5 88481.5 The Project T
- Page 22 and 23: August 2010 7 8848EAP Contact Detai
- Page 24 and 25: August 2010 9 88482 LEGAL REQUIREME
- Page 26 and 27: August 2010 11 8848On 1 May 2009, N
- Page 28 and 29: August 2010 13 8848• The role of
- Page 30 and 31: August 2010 15 8848• To provide a
- Page 32 and 33: August 2010 17 8848• Lay down gen
- Page 34 and 35: August 2010 19 8848Application Form
- Page 36 and 37: August 2010 21 8848APPLICATION /REG
- Page 38 and 39: August 2010 23 8848were received as
- Page 40 and 41: August 2010 25 8848• A descriptio
- Page 42 and 43: August 2010 27 8848(KV3 Engineers a
- Page 44 and 45: August 2010 29 88485 PROJECT DESCRI
- Page 46 and 47: August 2010 31 8848Capping of the W
- Page 48 and 49: August 2010 33 88485.6 Overall EIA
- Page 50 and 51: August 2010 35 8848Construction of
- Page 52 and 53: August 2010 37 8848There are differ
- Page 54 and 55: August 2010 39 88486 TECHNOLOGY REV
- Page 56 and 57: August 2010 418848Figure 10: Boitsh
- Page 58 and 59: August 2010 4388487 BASELINE RECEIV
- Page 60 and 61: August 2010 458848• Soil depth;
- Page 62 and 63: 47August 2010 8848Figure 12: Soil T
- Page 64 and 65: August 2010 4988487.1.3 Drainage Fe
- Page 66 and 67: August 2010 518848Figure 15: Upper
August 2010 3 8848Figure 1: Location of the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong>.ZITHOLELE CONSULTING