10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

August 2010 137884813 CONCLUSION AND RECOMMENDATIONSFrom the evaluation in Section 12 the various sensitivities have been added and Table 55below represents the summary of the impacts each alternative would pose on the study areaduring <strong>co</strong>nstruction, operation and closure.Table 55: Alternative summary and preference.SENSITIVITIESAlternative 1:0m buffer zoneAlternative 2:50m buffer zoneAlternative 3:100m buffer zoneDuring Construction 11.5 9.5 9.5During Operations 11.5 8.5 8.5During Closure 1 0.5 0.5TOTAL 24 18.5 18.5Preference 3 1 1The way <strong>for</strong>ward re<strong>co</strong>mmended by this study is as follows:• The Final EIR and EMP have been <strong>co</strong>mpiled and submitted to the Gauteng Departmentof Agriculture and Rural Development (GDARD) <strong>for</strong> approval;• Once the GDARD has reached a decision, an Environmental Authorisation (EA) will beissued; and• Upon receipt of the Environmental Authorisation (EA), <strong>Zitholele</strong> will notify all I&Aps onthe stakeholder database of the GDARD’s decision by means of letters.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!