10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

135August 2010 884812.1.1 Preferred AlternativeOn the basis of the findings in this report, it is suggested that alternative 2 (two) be utilisedas the preferred alternative <strong>for</strong> the proposed extension with view of closure of the <strong>Boitshepi</strong>Waste Disposal <strong>Site</strong> as it has the least sensitive features associated with it whilst be feasibleto meet the disposal needs of the <strong>co</strong>mmunity.This section provides a short sensitivity matrix, which <strong>co</strong>mpares the three differentalternatives and their associated environmental sensitivities.On the basis of the matrix presented below and the points listed above, it is suggested thatalternative two be utilised as the preferred alternative <strong>for</strong> the proposed <strong>Boitshepi</strong> WasteDisposal <strong>Site</strong> as it is the least sensitive of the feasible alternatives. Although Alternativethree has the smallest footprint and is the greater distance from the adjacent / surroundingland users it is cannot ac<strong>co</strong>mmodate the disposal needs in the area until the new wastedisposal site is <strong>co</strong>mmissioned.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!