10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

124August 2010 884811.3.2 TopographyWaste disposal site operations <strong>co</strong>ntinue until all the available permitted airspace has beenfilled. Once this happens, the site is closed and capped with a layer of impermeable clay anda layer of top soil. Grass and other suitable vegetation types are planted to stabilise the soiland improve the appearance.Initial ImpactThe initial impact to topography will remain a HIGH impact, and will be occurring in the studyarea and will be permanent. This impact is rated as a High impact.Additional ImpactThe study site is within a residential area; there<strong>for</strong>e the waste body will be shaped to suit thelocal topography of the study area and the site will be rehabilitated so that grass and anyother flora will vegetate on the waste body capping layer. The additional impact totopography is of LOW positive significance and is there<strong>for</strong>e rated as Low positive impactthat will definitely occur in the study area.Cumulative ImpactThe cumulative impact during the de<strong>co</strong>mmissioning phase remains as assessed above sincethe additional impact and the initial impact occur in the same area. There<strong>for</strong>e the impactremains as High impact.Mitigation MeasuresThe mitigation measures remain as assessed in Section 11.1.2 <strong>for</strong> all three alternatives,however the closure and capping are mitigation measures.Residual ImpactThe residual impact remains as assessed in the additional section.Table 45: Impact Rating Matrix <strong>for</strong> topography during the de<strong>co</strong>mmissioning phase(Alternative 1-3).Type of Significance Spatial Temporal Probability RatingImpactInitial HIGH Study site Permanent Will occur 4-HighAdditional VERY LOWIsolatedsitesPermanent Very Likely 1.9- Low positiveCumulative HIGH Study site Permanent Will occur 4-HighResidual VERY LOWIsolatedsitesPermanent Very Likely 1.9- Low positiveZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!