120August 2010 884811.2.10 Social EnvironmentInitial ImpactThe initial impact remains as assessed in Section 11.1.10, a Moderate Positive Impact <strong>for</strong>re-claimer livelihoods and a High Negative Impact <strong>for</strong> health and nuisance <strong>for</strong> all threealternatives.Additional ImpactRe-claimer livelihoodCurrently, there are 500 re-claimers on site. With the proposed extension of the wastedisposal site <strong>for</strong> different alternatives, the impacts of job creation <strong>for</strong> each are assesseddifferently.Alternative 1 and 2: Extension of the waste disposal site footprint with a 0 or 50 metrebuffer zone (none to 50m distance between waste disposal site and surrounding land users).There will be an increased in the number of years the site is operational and hence reclaimerswill earn a living <strong>for</strong> a longer period of time. There<strong>for</strong>e, <strong>for</strong> this alternative, theimpact on increased employment opportunities will be MODERATE positive impact <strong>for</strong> reclaimers.This will be of medium term as the estimated lifespan of the waste disposal site.Alternative 3: Extension of the waste disposal site footprint with a 100 metre buffer zone.The site will then operate <strong>for</strong> a very short period of time and there<strong>for</strong>e there will be lessairspace <strong>for</strong> disposal, and there<strong>for</strong>e less waste to be disposed on the proposed site. Theimpact will be LOW, acting on a short-term period. Increased employment opportunities<strong>co</strong>uld occur.Health and NuisanceThe <strong>co</strong>mmunity are <strong>co</strong>ncerned about the odours emanating from the site that is not only anuisance, but may pose a health risk to them. This impact will persist <strong>for</strong> the life of the wastedisposal site, prior to rehabilitation. This impact is assessed <strong>for</strong> all different alternatives.Alternative 1: Extension of the waste disposal site footprint with a 0 metre buffer zone (nodistance between waste disposal site and surrounding land users). The only time that thiswill be reduced or eliminated will be through rehabilitation and subsequently closure. Theimpact is of VERY HIGH significance and will be of short-term. It is definite that the odourswill emanate <strong>for</strong> the life of the waste disposal site.Alternative 2: Extension of the waste disposal site footprint with a 50 metre buffer zone. Theimpact will be HIGH – MODERATE and will be of medium- term.Alternative 3: Extension of the waste disposal site footprint with a 100 metre buffer zone.The impact will be MODERATE to LOW, acting on a short-term period.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!