10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

116August 2010 8848Mitigation MeasuresThe mitigation measures remain as assessed and re<strong>co</strong>mmended in Section 11.1.6 above.Residual ImpactThe residual impact remains as assessed and re<strong>co</strong>mmended in Section 11.1.6 above.Table 39: Impact Rating Matrix <strong>for</strong> E<strong>co</strong>logy (Alternative 1-3).Type of Significance Spatial Temporal Probability RatingImpactInitial HIGH Study site Long Term Has already occurred 3.3 – HighAdditional LOW Study site Short Term Could Occur 1.3 LowCumulative HIGH Study site Long Term Has already occurred 3.3- HighResidual HIGH Study site Long Term Has already occurred 3.3- High11.2.7 Visual ImpactInitial ImpactThe initial impact remains as assessed in the <strong>co</strong>nstruction phase in Section 11.1.7.Additional ImpactFor the proposed extension of the waste disposal site, the visual appearance of the<strong>Boitshepi</strong> Waste Disposal <strong>Site</strong> will undergo gradual change over the months as the variouswaste cells take shape. The height of each cell at any given point in time will depend on therelative rates at which material is deposited and removed <strong>for</strong> beneficial use.The worst case scenario would develop if:• No beneficial uses are developed <strong>for</strong> any of the materials and all the cells <strong>co</strong>ntinuegrowing in height until the design storage capacity of the <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong>is reached and the facility has to be closed due to a lack of storage space <strong>for</strong> additionalmaterial.Alternative 1: Extension of the waste disposal site footprint with a 0 metre buffer zone (nodistance between waste disposal site and surrounding land users). The significance of thevisual impact without mitigation is assessed as high <strong>for</strong> alternative 1.Alternative 2 and 3: Extension of the waste disposal site footprint with a 50 metre or 100metre buffer zone. The impact will there<strong>for</strong>e be MODERATE to LOW and will be in the longterm.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!