10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

114August 2010 8848Cumulative ImpactFigure 30: Windblown litter to the vlei to the south of the site.The cumulative impact will remain as assessed in the additional impact section, that is aModerate impact.Mitigation MeasuresAdditionally to the mitigation measures proposed in the <strong>co</strong>nstruction phase, waste must be<strong>co</strong>vered on a daily basis, storm water infrastructure must be maintained and monitored aslitter pickers must be deployed to pick up windblown litter around the site.Residual ImpactShould the mitigation measures proposed <strong>for</strong> <strong>co</strong>nstruction and operation be successfullyimplemented the impact will be lowered to a MODERATE significance in the study area andthere<strong>for</strong>e be a Low impact.Table 37: Impact Rating Matrix <strong>for</strong> surface water during the operational phase(Alternative 1-3).Type of Significance Spatial Temporal Probability RatingImpactInitial HIGH Local Short –Term Could happen 2- ModerateAdditional HIGH Local Short –Term Could happen 2- ModerateCumulative HIGH Local Short –Term Could happen 2- ModerateResidual MODERATE Study site Short –Term Could happen 1.4- Low11.2.5 GeotechnicalInitial ImpactThe initial impact remains as assessed in 11.1.5, a Low impact.ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!