10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

111August 2010 884811.2.2 TopographyInitial ImpactThe initial impact to topography is a MODERATE negative impact which will occur in thestudy area and will be permanent. This impact is occurring and as such is rated as a Highimpact as in the <strong>co</strong>nstruction phase.Additional ImpactThe additional impact remains as assessed in the <strong>co</strong>nstruction phase.Cumulative ImpactThe cumulative impact during the operational phase remains as assessed above since theadditional impact and the initial impact occur in the same area. There<strong>for</strong>e the impact remainsas High impact.Mitigation MeasuresThe change in topography is essential <strong>for</strong> the proper functioning of the proposed <strong>Boitshepi</strong>Waste Disposal <strong>Site</strong> and no mitigation is required.Residual ImpactDue to the fact that the change <strong>for</strong> the proposed extension is essential, and no mitigationmeasure is required, the residual impact without the implementation of the mitigationmeasures will remain as High impact.Table 35: Impact Rating Matrix <strong>for</strong> topography during the operational phase(Alternative 1-3).InitialType ofImpactAdditionalCumulativeResidualAlternative Significance Spatial Temporal Probability Rating1-31 and 231-31-3MODERATELOWLOWMODERATEMODERATEStudysiteIsolatedsiteIsolatedsitesStudysiteStudysitePermanent Is Occurring 3.3.- HighPermanentWill occur2.6 –ModeratePermanent Very Likely 1.9 - LowPermanent Will occur 3.3- HighPermanent Will occur 3.3- HighZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!