- Page 1:
August 2010Authorisation PhaseENVIR
- Page 4:
August 2010 iii 8848consultation wi
- Page 8 and 9:
August 2010 vii 8848GNRGPSHHDIH:hH:
- Page 10 and 11:
August 2010 ix 8848SECTIONTABLE OF
- Page 12 and 13:
August 2010 xi 8848LIST OF FIGURESF
- Page 14 and 15:
August 2010 xiii 8848Table 31: Impa
- Page 16 and 17:
August 2010 1 88481 INTRODUCTIONAnt
- Page 18 and 19:
August 2010 3 8848Figure 1: Locatio
- Page 20 and 21:
August 2010 5 88481.5 The Project T
- Page 22 and 23:
August 2010 7 8848EAP Contact Detai
- Page 24 and 25:
August 2010 9 88482 LEGAL REQUIREME
- Page 26 and 27:
August 2010 11 8848On 1 May 2009, N
- Page 28 and 29:
August 2010 13 8848• The role of
- Page 30 and 31:
August 2010 15 8848• To provide a
- Page 32 and 33:
August 2010 17 8848• Lay down gen
- Page 34 and 35:
August 2010 19 8848Application Form
- Page 36 and 37:
August 2010 21 8848APPLICATION /REG
- Page 38 and 39:
August 2010 23 8848were received as
- Page 40 and 41:
August 2010 25 8848• A descriptio
- Page 42 and 43:
August 2010 27 8848(KV3 Engineers a
- Page 44 and 45:
August 2010 29 88485 PROJECT DESCRI
- Page 46 and 47:
August 2010 31 8848Capping of the W
- Page 48 and 49:
August 2010 33 88485.6 Overall EIA
- Page 50 and 51:
August 2010 35 8848Construction of
- Page 52 and 53:
August 2010 37 8848There are differ
- Page 54 and 55:
August 2010 39 88486 TECHNOLOGY REV
- Page 56 and 57:
August 2010 418848Figure 10: Boitsh
- Page 58 and 59:
August 2010 4388487 BASELINE RECEIV
- Page 60 and 61:
August 2010 458848• Soil depth;
- Page 62 and 63:
47August 2010 8848Figure 12: Soil T
- Page 64 and 65:
August 2010 4988487.1.3 Drainage Fe
- Page 66 and 67:
August 2010 518848Figure 15: Upper
- Page 68 and 69:
53August 2010 8848Figure 16: Topogr
- Page 70 and 71:
August 2010 558848Soweto Highveld G
- Page 72 and 73:
August 2010 578848Figure 18: Alien
- Page 74 and 75: 59August 2010 8848Species ListThe f
- Page 76 and 77: 61August 2010 8848Common Name Scien
- Page 78 and 79: 63August 2010 8848five decades ago
- Page 80 and 81: 65August 2010 8848steel industry, I
- Page 82 and 83: 67August 2010 88488 WASTE LICENSE A
- Page 84 and 85: 69August 2010 8848Waste disposal si
- Page 86 and 87: 71August 2010 8848Table 13 below il
- Page 88 and 89: 73August 2010 8848continue to monit
- Page 90 and 91: 75August 2010 88489 WASTE DISPOSAL
- Page 92 and 93: 77August 2010 88489.2.1 Extension o
- Page 94 and 95: 79August 2010 8848Figure 26: Site l
- Page 96 and 97: 81August 2010 884810 IMPACT ASSESSM
- Page 98 and 99: 83August 2010 884810.3 Duration Sca
- Page 100 and 101: 85August 2010 884811 IMPACT ASSESSM
- Page 102 and 103: 87August 2010 8848• Link the exte
- Page 104 and 105: 89August 2010 8848Type ofImpactCumu
- Page 106 and 107: 91August 2010 8848Figure 28: Piezom
- Page 108 and 109: 93August 2010 884811.1.4 Surface wa
- Page 110 and 111: 95August 2010 8848seepage of ground
- Page 112 and 113: 97August 2010 8848Table 29: Impact
- Page 114 and 115: 99August 2010 8848Table 30: Impact
- Page 116 and 117: 101August 2010 8848• As a minimum
- Page 118 and 119: 103August 2010 8848Table 32: Impact
- Page 120 and 121: 105August 2010 8848material. Not on
- Page 122 and 123: 107August 2010 8848Safety• Access
- Page 126 and 127: 111August 2010 884811.2.2 Topograph
- Page 128 and 129: 113August 2010 8848It is understood
- Page 130 and 131: 115August 2010 8848Additional Impac
- Page 132 and 133: 117August 2010 8848Cumulative Impac
- Page 134 and 135: 119August 2010 8848Additional Impac
- Page 136 and 137: 121August 2010 8848TrafficDuring th
- Page 138 and 139: 123August 2010 884811.3 Decommissio
- Page 140 and 141: 125August 2010 884811.3.3 Groundwat
- Page 142 and 143: 127August 2010 884811.3.5 Geotechni
- Page 144 and 145: 129August 2010 8848Additional Impac
- Page 146 and 147: 131August 2010 8848Additional Impac
- Page 148 and 149: 133August 2010 8848Table 53: Impact
- Page 150 and 151: 135August 2010 884812.1.1 Preferred
- Page 152: August 2010 137884813 CONCLUSION AN