10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

102August 2010 8848is to be developed in some way that may involve excavations of the underlying soils strata inthe future.The significance of the additional impact will there<strong>for</strong>e be VERY LOW at isolated sites thatwould occur incidentally, the impact is there<strong>for</strong>e rated as Very Low.Cumulative ImpactThe site is currently being operated, and there<strong>for</strong>e disposal of waste is currently occurring.The <strong>co</strong>nstruction cumulative impacts of the proposed extension of the <strong>Boitshepi</strong> WasteDisposal <strong>Site</strong> with the activities already taking place on site (disposal of waste) and the<strong>co</strong>nstruction activities associated with a waste disposal site will be rated Very Low.Since there is no initial impact, the cumulative impact is rated as per the additional impact.Mitigation MeasuresIf any heritage resources of significance are exposed during the <strong>co</strong>nstruction phase of theproject, following are measures that should be taken in <strong>co</strong>gnisance:• All <strong>co</strong>nstruction activities must cease;• The South African Heritage Resources Authority Agency (SAHRA) shall be notifiedimmediately; and• An archaeologist accredited by the Association <strong>for</strong> Southern African ProfessionalArchaeologists (ASAPA) shall be notified in order to determine appropriate mitigationmeasures <strong>for</strong> the dis<strong>co</strong>vered finds.This may include obtaining the necessary authorisation (s) (permit (s)) from SAHRA toimplement the appropriate mitigation measures.Residual ImpactIn cases where heritage resources in the project area are exposed/found beneath theexisting <strong>Boitshepi</strong> Waste Disposal <strong>Site</strong> during the <strong>co</strong>nstruction activities, and the abovemitigation measures are implemented and adhered to, the residual impact on the heritageresources will have be VERY LOW,ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!