10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

92August 2010 8848Additional ImpactThe site preparation and liner <strong>co</strong>nstruction activities will involve the use of earth movingequipment and vehicles to strip the topsoil, excavate the clay to be used <strong>for</strong> lining material,shape and profile the site to achieve the required drainage of leachate from the individualcells to the leachate ponds and to install the storm water <strong>co</strong>ntrol systems and otherinfrastructure. Such activities have the potential <strong>for</strong> the <strong>co</strong>ntamination of the soil with fuels,lubricants and hydraulic fluids from the machinery and from cement during the <strong>co</strong>nstructionof the infrastructure, but would not <strong>co</strong>mpromise use of the aquifer, since there are no knowngroundwater users within proposed site. All seven boreholes where analysed, and however,the water quality in Borehole B4A is poor with Manganese.During the <strong>co</strong>nstruction phase, the additional impact will remain of MODERATE significanceimpacting at isolated sites in the short term and <strong>co</strong>uld occur, and will there<strong>for</strong>e result in aLow impact.Cumulative ImpactThe cumulative impact during the <strong>co</strong>nstruction phase remains as assessed above since theadditional impact and the initial impact occur in the same area. There<strong>for</strong>e the impact remainsas Moderate impact.Mitigation MeasuresMitigation measures include the refuelling of vehicles off-site, servicing them in properlyequipped workshops, placing drip trays under parked vehicles, cleaning up any spillsimmediately, discharging water from cleaning of cement mixing equipment to sewer, andexcavating any <strong>co</strong>ntaminated soil immediately, followed by proper disposal at a licensed site.Residual ImpactThe residual impact will be reduced if proper mitigation measures are followed. The impactwill be reduced from MODERATE to LOW.The table below provides a summary of groundwater impact during the <strong>co</strong>nstruction phase.Table 26: Impact Rating Matrix <strong>for</strong> groundwater during the <strong>co</strong>nstruction phase(Alternative 1-3).Type of Significance Spatial Temporal Probability RatingImpactInitial MODERATE Study area Long Term Very Likely2.4 –ModerateAdditional MODERATE Isolated sites Short Term Could occur 1.2 LowCumulative MODERATE Study area Long Term Very Likely2.4 –ModerateResidual MODERATE Isolated <strong>Site</strong>sShort –TermCould Occur 1.2- LowZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!