10.07.2015 Views

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

FEIR for Boitshepi Landfill Site .pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

87August 2010 8848• Link the extension to the existing leachate <strong>co</strong>llection system;• Ensure that the existing leachate <strong>co</strong>llection system is in good working order andmonitored;• Ensure that all machinery on site is in a good working order;• Limit all activities to the proposed extended waste disposal site;• Ensure that adequate storm water <strong>co</strong>ntrol measures are in place to prevent erosion;• Spread absorbent sand on areas where oil spills are likely to occur, such as therefuelling area in the hard park (if present);• Oil-<strong>co</strong>ntaminated soils are to be removed to a <strong>co</strong>ntained storage area and bioremediatedor disposed of at a licensed facility;• If soils are excavated <strong>for</strong> the levelling operations, ensure that the soil is utilisedelsewhere <strong>for</strong> <strong>co</strong>ver material in the waste disposal site;• Ensure that soil is stockpiled in such a way as to prevent erosion from storm water;• When closing the site, ensure that the site is properly capped to prevent the infiltration ofwater into the waste body.Residual ImpactThe residual impact with the successful implementation of the mitigation measuresmentioned above will be slightly less significant as the probability reduces. There<strong>for</strong>e therating reduces to Moderate.The table below provides a summary of the impact on soils and land capability in the<strong>co</strong>nstruction phase.Table 22: Impact Rating Matrix <strong>for</strong> soils and land capability during the <strong>co</strong>nstructionphase (Alternative 1-3).Type of Significance Spatial Temporal Probability RatingImpactInitial VERY HIGH Study site Long Term Is Occurring 3.7- HighAdditional HIGH Study site Short Term Will occur 2.7- ModerateCumulative HIGH Study site Long Term Will occur 3.3- HighResidual HIGH Study site Long Term Very Likely 2.7- Moderate11.1.2 TopographyInitial ImpactThe study site is within the existing fenced off existing waste disposal site; there<strong>for</strong>e thetopography of the study area is already disturbed. The initial impact to topography isZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!