Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Formats <strong>for</strong> MYT <strong>Petition</strong> <strong>for</strong> the Control PeriodName of Transmission Licensee: PTCULForm 9.2: Deposit works and grants/subsidies <strong>to</strong>wards cost of capital assetsIntra State TransmissionPrevious year (2011-12) Current <strong>Year</strong> (2012-13) Ensuing year (<strong>2013</strong>-<strong>14</strong>) Ensuing year (20<strong>14</strong>-15)Ensuing year (<strong>2015</strong>-<strong>16</strong>)S.No.ParticularsBalance at thestart of the year AdditionsBalance at theend of the yearAdditionsBalance at theend of the yearAdditionsBalance at theend of the yearAdditionsBalance at theend of the yearAdditionsBalance at theend of the year12ConsumerContribution/Deposit works<strong>to</strong>wards cost of capitalassetsGrants/subsidies <strong>to</strong>wardscost of capital assets39.28 42.04 81.32 81.32 81.32 81.32 81.32- - - - -Total 39.28 42.04 81.32 - 81.32 - 81.32 - 81.32 - 81.32Power Transmission Corporation of Uttarakhand Ltd. 28