10.07.2015 Views

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Formats <strong>for</strong> MYT <strong>Petition</strong> <strong>for</strong> the Control PeriodName of Transmission Licensee: PTCULForm 9.1 (a) : Statement of Total Gross Fixed AssetIntra State TransmissionPrevious <strong>Year</strong> (2011-12)Particulars of AssetsLandBuildingCivil WorksHydraulic WorksPlant and MachineryLines, Cables, Networks etc.VehiclesFurniture and FixturesOffice EquipmentsStation suppliesOthersTotalCurrent <strong>Year</strong> (2012-13)Particulars of AssetsOld AssetsREC Old SchemeNABARD SchemeREC New SchemeREC IVREC VREC VIREC VIIREC VIIIREC IXREC XPlanned Schemes funded by PFC/RECGrants, Deposit Works, etc.Other Than Schemes (SI)TotalOpeningBalanceOpeningBalanceRetirement ofAssets duringthe yearAdditionsduring the yearClosing balance36.53 2.76 - 39.3042.44 2.70 - 45.<strong>14</strong>1.78 1.22 - 2.990.20 1.00 - 1.19275.33 107.79 - 383.12331.75 134.09 - 465.830.77 - - 0.770.94 0.19 - 1.131.21 0.21 - 1.42--690.94 249.96 - 940.91AdditionsEstimated <strong>for</strong><strong>FY</strong> 12-13Retirement ofEstimated <strong>for</strong> <strong>FY</strong>12-13Closing balance221.11 - 221.111<strong>16</strong>.52 54.23 - 170.75294.60 - 294.6088.62 7.<strong>14</strong> - 95.7643.31 34.84 - 78.1567.<strong>14</strong> 22.84 - 89.98- - -- - -- - -11.47 - 11.47- - -- - -81.32 - 81.3228.29 11.42 - 39.71940.91 <strong>14</strong>1.92 - 1,082.83Power Transmission Corporation of Uttarakhand Ltd. 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!