10.07.2015 Views

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PETITION FOR TRUE-UP OF <strong>FY</strong> 2004 TO <strong>FY</strong> 2011-12 &MYT PETITION FOR THE CONTROL PERIOD <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>4.2.17 INCENTIVE FOR ACHIEVING TARGET AVAILABILITYIn accordance with the <strong>Tariff</strong> Regulations 2011, Incentive depends on the actual availability at the end ofthe year, hence same shall be considered at the time of truing up.4.2.18 AGGREGATE REVENUE REQUIREMENT FOR <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>2015</strong>-<strong>16</strong>Based on the parameters discussed in the above paragraphs, the Projected Aggregate RevenueRequirement (ARR) of PTCUL <strong>for</strong> each year of the Control Period <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> <strong>to</strong> <strong>FY</strong> <strong>2015</strong>-<strong>16</strong> is providedin table below:Table 43: ARR <strong>for</strong> Intra State Transmission <strong>for</strong> <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> <strong>to</strong> <strong>FY</strong> <strong>2015</strong>-<strong>16</strong> (Figures in Rs Crore)Particulars <strong>2013</strong>-<strong>14</strong> 20<strong>14</strong>-15 <strong>2015</strong>-<strong>16</strong>Depreciation 58.44 65.17 70.79Interest on Loan 68.55 76.13 91.88Return on Equity 39.<strong>16</strong> 47.81 58.25Operations and Maintenance ExpensesEmployee Expenses 79.11 89.78 102.65R&M Expenses 32.44 41.44 45.97A&G Expenses 20.29 26.74 33.65Guarantee Fees 5.52 7.39 7.87Interest on Working Capital 10.99 12.97 15.01Net Expenditure 3<strong>14</strong>.51 367.43 426.07Less: Non <strong>Tariff</strong> Incomes 1.30 1.37 1.44Aggregate Revenue Requirement (ARR) 313.21 366.06 424.634.2.19 ANNUAL TRANSMISSION CHARGES FOR <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>The annual transmission charges shall be determined as stated under Regulation 68 of the <strong>UERC</strong> <strong>Tariff</strong>Regulations 2011:“The Annual Transmission Charges <strong>for</strong> the Transmission Licensee shall be determined, based on thenorms as specified in these Regulations and recovered on monthly basis as transmission charge from theusers who shall share the Transmission Charge in proportion of the allotted transmission capacity.”The generation capacity estimated <strong>to</strong> be handled by PTCUL intra-state transmission system <strong>for</strong> <strong>FY</strong> 2012-13 is 1960MW. An annual growth of 9% has been assumed during the Control Period <strong>for</strong> projecting thecapacity handled by the PTCUL transmission system.Power Transmission Corporation of Uttarakhand Ltd. Page 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!