10.07.2015 Views

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PETITION FOR TRUE-UP OF <strong>FY</strong> 2004 TO <strong>FY</strong> 2011-12 &MYT PETITION FOR THE CONTROL PERIOD <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>Particulars Equity Loan Grant TotalREC Old Scheme 28.55 87.97 1<strong>16</strong>.52NABARD Scheme 64.81 229.79 294.60REC New Scheme 88.62 88.62REC-IV Scheme 12.99 30.32 43.31REC-V Scheme 20.<strong>14</strong> 47.00 67.<strong>14</strong>Other than schemes 8.49 19.81 28.29Deposit Works 81.32 81.32Less: Deletion of Assets 12.68 29.60 42.28Closing Value 201.31 658.27 81.32 940.9<strong>14</strong>.2.6 DEPRECIATIONThe projected gross fixed asset has been provided in the <strong>for</strong>egoing section. Depreciation <strong>for</strong> the year hasbeen calculated on the opening gross fixed asset base considering the rates prescribed by the <strong>Tariff</strong>Regulations, 2011. Pro-rata deprecation has been calculated <strong>for</strong> assets which are in operation <strong>for</strong> part ofthe year. Average rate of 5.28% has been considered <strong>for</strong> computing the depreciation.The tables below indicate the Depreciation <strong>for</strong> each year of the Control Period:ParticularsTable 27: Depreciation <strong>for</strong> <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> (Figures in Rs Crore)OpeningGFA as on1.4.<strong>2013</strong>GrantsDepreciableOpening GFAAdditions in<strong>FY</strong> <strong>2013</strong>-<strong>14</strong>TotalDepreciationOld Assets 221.11 221.11 0.00 11.67REC Old Scheme 170.75 170.75 0.00 9.25NABARD Scheme 294.60 294.60 0.00 15.56REC New Scheme 95.75 95.75 35.88 5.72REC IV 78.15 78.15 80.01 8.08REC V 89.98 89.98 0.00 5.00REC-VI 0.00 0.00 0.00 0.00REC-VII 0.00 0.00 0.00 0.00REC-VIII 0.00 0.00 0.00 0.03REC-IX 11.47 11.47 0.00 0.64REC-X 0.00 0.00 0.00 0.99Planned Schemes <strong>to</strong> be funded byPFC/REC0.00 0.00 0.00 0.00Grants, Deposit Works, etc. 81.32 81.32 0.00 0.00 0.00Other than schemes 39.71 39.71 12.50 1.49Total 1082.83 81.32 1001.51 128.38 58.44Power Transmission Corporation of Uttarakhand Ltd. Page 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!