Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PETITION FOR TRUE-UP OF <strong>FY</strong> 2004 TO <strong>FY</strong> 2011-12 &MYT PETITION FOR THE CONTROL PERIOD <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>Particulars Equity Loan Grant TotalREC Old Scheme 28.55 87.97 1<strong>16</strong>.52NABARD Scheme 64.81 229.79 294.60REC New Scheme 88.62 88.62REC-IV Scheme 12.99 30.32 43.31REC-V Scheme 20.<strong>14</strong> 47.00 67.<strong>14</strong>Other than schemes 8.49 19.81 28.29Deposit Works 81.32 81.32Less: Deletion of Assets 12.68 29.60 42.28Closing Value 201.31 658.27 81.32 940.9<strong>14</strong>.2.6 DEPRECIATIONThe projected gross fixed asset has been provided in the <strong>for</strong>egoing section. Depreciation <strong>for</strong> the year hasbeen calculated on the opening gross fixed asset base considering the rates prescribed by the <strong>Tariff</strong>Regulations, 2011. Pro-rata deprecation has been calculated <strong>for</strong> assets which are in operation <strong>for</strong> part ofthe year. Average rate of 5.28% has been considered <strong>for</strong> computing the depreciation.The tables below indicate the Depreciation <strong>for</strong> each year of the Control Period:ParticularsTable 27: Depreciation <strong>for</strong> <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> (Figures in Rs Crore)OpeningGFA as on1.4.<strong>2013</strong>GrantsDepreciableOpening GFAAdditions in<strong>FY</strong> <strong>2013</strong>-<strong>14</strong>TotalDepreciationOld Assets 221.11 221.11 0.00 11.67REC Old Scheme 170.75 170.75 0.00 9.25NABARD Scheme 294.60 294.60 0.00 15.56REC New Scheme 95.75 95.75 35.88 5.72REC IV 78.15 78.15 80.01 8.08REC V 89.98 89.98 0.00 5.00REC-VI 0.00 0.00 0.00 0.00REC-VII 0.00 0.00 0.00 0.00REC-VIII 0.00 0.00 0.00 0.03REC-IX 11.47 11.47 0.00 0.64REC-X 0.00 0.00 0.00 0.99Planned Schemes <strong>to</strong> be funded byPFC/REC0.00 0.00 0.00 0.00Grants, Deposit Works, etc. 81.32 81.32 0.00 0.00 0.00Other than schemes 39.71 39.71 12.50 1.49Total 1082.83 81.32 1001.51 128.38 58.44Power Transmission Corporation of Uttarakhand Ltd. Page 31