Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PETITION FOR TRUE-UP OF <strong>FY</strong> 2004 TO <strong>FY</strong> 2011-12 &MYT PETITION FOR THE CONTROL PERIOD <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>remained pending with UPCL and were transferred by way of Inter Unit Transactions (IUTs). Thereconciliation of the scheme-wise capital cost is complete and the report of the independent charteredaccountant firm is available (Enclosed as Annexure-4).Accordingly <strong>for</strong> the purpose of consideration of opening balance of assets <strong>for</strong> the first year of the controlperiod i.e. <strong>FY</strong> <strong>2013</strong>-<strong>14</strong>, the petitioner has considered the opening assets of Rs. 263.17 Crore assigned <strong>to</strong>PTCUL in the transfer scheme in <strong>FY</strong> 2004-05 and capitalization thereafter (as per the annual accounts).The movement of GFA balances along with the scheme wise classification is provided in the table below:ParticularsTable 20: Classification of GFA balance along major schemes (Figures in Rs Crore)<strong>FY</strong>2005<strong>FY</strong>2006<strong>FY</strong>2007Opening Value 263.39 267.47 295.50 392.94 524.78 557.76 612.81 690.94Additions in the yearREC Old Scheme 3.21 18.86 - 4.61 - 0.02 45.28 44.54NABARD Scheme - - 69.15 93.12 27.87 42.88 12.<strong>16</strong> 49.41REC New Scheme - - - 30.89 2.90 9.66 20.84 24.32REC-IV Scheme - - - - - - 20.67 22.64REC-V Scheme - - - - - - - 67.<strong>14</strong>Other than schemes 0.91 1.31 1.34 1.30 2.20 2.71 2.20 <strong>16</strong>.32Deposit Works - 8.92 28.31 2.09 - - - 42.00Less: Deletion of Assets 0.03 1.07 1.36 0.<strong>16</strong> 0.23 23.03 <strong>16</strong>.40Total Net Additions 4.08 28.02 97.44 131.84 32.98 55.05 78.13 249.96<strong>FY</strong>2008<strong>FY</strong>2009<strong>FY</strong>2010<strong>FY</strong>2011<strong>FY</strong>2012Closing Value 267.47 295.50 392.94 524.78 557.76 612.81 690.94 940.9<strong>14</strong>.2.4 CAPITAL EXPENDITURE FOR THE CONTROL PERIODAs submitted in the Business Plan <strong>for</strong> <strong>FY</strong> 2012-13 <strong>to</strong> <strong>FY</strong> 20<strong>16</strong>-17 <strong>for</strong> approval of the Hon‟ble Commission,PTCUL is in the process of strengthening its Transmission System (132KV & above) <strong>to</strong> meet the loadgrowth requirement of Uttarakhand & also <strong>for</strong> evacuation of power from various genera<strong>to</strong>rs i.e. Hydro aswell as gas based, which are coming up in Uttarakhand.The physical targets <strong>to</strong> be achieved during the Control Period as highlighted in the Business Plan arereproduced below:Table 21: Physical Targets <strong>for</strong> Control PeriodControl Period TargetsS. No Item Unit Annual Plan<strong>2013</strong>-<strong>14</strong>Annual Plan20<strong>14</strong>-15Annual Plan<strong>2015</strong>-<strong>16</strong>ControlPeriod1 132 KV Substation No/MVA 2/80 2/190 1/80 5/3502 220 KV Substation No/MVA 1/420 2/330 1/100 4/8503 400 KV Substation No/MVA 1/705 0/0 1/630 2/1335Power Transmission Corporation of Uttarakhand Ltd. Page 28