10.07.2015 Views

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PETITION FOR TRUE-UP OF <strong>FY</strong> 2004 TO <strong>FY</strong> 2011-12 &MYT PETITION FOR THE CONTROL PERIOD <strong>FY</strong> <strong>2013</strong>-<strong>14</strong> TO <strong>FY</strong> <strong>2015</strong>-<strong>16</strong>remained pending with UPCL and were transferred by way of Inter Unit Transactions (IUTs). Thereconciliation of the scheme-wise capital cost is complete and the report of the independent charteredaccountant firm is available (Enclosed as Annexure-4).Accordingly <strong>for</strong> the purpose of consideration of opening balance of assets <strong>for</strong> the first year of the controlperiod i.e. <strong>FY</strong> <strong>2013</strong>-<strong>14</strong>, the petitioner has considered the opening assets of Rs. 263.17 Crore assigned <strong>to</strong>PTCUL in the transfer scheme in <strong>FY</strong> 2004-05 and capitalization thereafter (as per the annual accounts).The movement of GFA balances along with the scheme wise classification is provided in the table below:ParticularsTable 20: Classification of GFA balance along major schemes (Figures in Rs Crore)<strong>FY</strong>2005<strong>FY</strong>2006<strong>FY</strong>2007Opening Value 263.39 267.47 295.50 392.94 524.78 557.76 612.81 690.94Additions in the yearREC Old Scheme 3.21 18.86 - 4.61 - 0.02 45.28 44.54NABARD Scheme - - 69.15 93.12 27.87 42.88 12.<strong>16</strong> 49.41REC New Scheme - - - 30.89 2.90 9.66 20.84 24.32REC-IV Scheme - - - - - - 20.67 22.64REC-V Scheme - - - - - - - 67.<strong>14</strong>Other than schemes 0.91 1.31 1.34 1.30 2.20 2.71 2.20 <strong>16</strong>.32Deposit Works - 8.92 28.31 2.09 - - - 42.00Less: Deletion of Assets 0.03 1.07 1.36 0.<strong>16</strong> 0.23 23.03 <strong>16</strong>.40Total Net Additions 4.08 28.02 97.44 131.84 32.98 55.05 78.13 249.96<strong>FY</strong>2008<strong>FY</strong>2009<strong>FY</strong>2010<strong>FY</strong>2011<strong>FY</strong>2012Closing Value 267.47 295.50 392.94 524.78 557.76 612.81 690.94 940.9<strong>14</strong>.2.4 CAPITAL EXPENDITURE FOR THE CONTROL PERIODAs submitted in the Business Plan <strong>for</strong> <strong>FY</strong> 2012-13 <strong>to</strong> <strong>FY</strong> 20<strong>16</strong>-17 <strong>for</strong> approval of the Hon‟ble Commission,PTCUL is in the process of strengthening its Transmission System (132KV & above) <strong>to</strong> meet the loadgrowth requirement of Uttarakhand & also <strong>for</strong> evacuation of power from various genera<strong>to</strong>rs i.e. Hydro aswell as gas based, which are coming up in Uttarakhand.The physical targets <strong>to</strong> be achieved during the Control Period as highlighted in the Business Plan arereproduced below:Table 21: Physical Targets <strong>for</strong> Control PeriodControl Period TargetsS. No Item Unit Annual Plan<strong>2013</strong>-<strong>14</strong>Annual Plan20<strong>14</strong>-15Annual Plan<strong>2015</strong>-<strong>16</strong>ControlPeriod1 132 KV Substation No/MVA 2/80 2/190 1/80 5/3502 220 KV Substation No/MVA 1/420 2/330 1/100 4/8503 400 KV Substation No/MVA 1/705 0/0 1/630 2/1335Power Transmission Corporation of Uttarakhand Ltd. Page 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!