10.07.2015 Views

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

Multi-Year Tariff Petition for FY 2013-14 to FY 2015-16 - UERC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Formats <strong>for</strong> MYT <strong>Petition</strong> <strong>for</strong> the Control Period4 220/33 KV GIS S/s Ghansali <strong>14</strong>0.50 Dec-<strong>14</strong>Increasing Capacity of 220/33 KV S/s5 SIDCUL Haridwar 20.00 Dec-<strong>14</strong>6 220/33 KV S/s Piran Kaliyar 41.83 Mar-15Increasing Capacity at 220/132 KV S/s7 Pantnagar 13.00 May-<strong>14</strong>8 220/33 KV GIS S/s Puhana 70.00 Sep-15Sub Total (IV) (220 kV S/S) 337.06V132 kV Lines:1 LILO of 132 KV Sitarganj-Kiccha Line 30 9.00 Dec-122 132 KV Satpuli-Srinagar Line 103.4 40.47 Feb-133 132 KV Purkul-Bindal link line 11 5.24 Mar-13132 KV Almora-Pithoragarh line at 2204 KV S/s Pithoragarh (PGCIL) 20 5.46 Mar-13LILO of 132 KV Dhalipur-Purkul line at5 220 KV S/s Dehradun 2 0.80 Jun-13LILO of 132 KV Kulhal-Majra Line at 2206 KV S/s Dehradun 2 0.80 Jun-13LILO of 132 KV Majra-Rishikesh line at7 132 KV S/S Laltappar 2 1.74 Jun-138 132 KV D/C Srinagar-Simli Line 128 89.51 Mar-<strong>14</strong>9 132 KV Ranikhet-Bageshwar line 60 25.90 Jun-<strong>14</strong>10 132 KV S/C Lohaghat - Pithoragarh line 50 64.05 Mar-15LILO of 132 KV Khatima – Sitarganj11 (PGCIL) line at 132 KV S/s Khatima – II 10 7.00 Dec-15Sub Total (V) (132 kV Lines) 418.4VI132 kV Sub StationsIncreasing Capacity at 132 KV S/s1 PithoragarhEnergized on01.07.20122 132 KV S/s SIDCUL Sitarganj 18.04Energized on09.10.123 132 KV Switching S/s Srinagar-II 19.77 Jun-134 132 KV S/s Bageshwar 13.93 Jun-<strong>14</strong>Increasing Capacity of 132 KV S/s5 Bazpur 12.00 Jun-<strong>14</strong>Increasing Capacity of 132 KV S/s6 Kathgodam 4.50 Jun-<strong>14</strong>Increasing Capacity of 132 KV S/s7 Bhowali 4.50 Jun-<strong>14</strong>Increasing Capacity of 132 KV S/s8 Almora 3.00 Jun-<strong>14</strong>9 132 KV S/s Lohaghat 39.71 Mar-1510 132 KV S/s Lal Tappar, Dehradun 24.93 Jun-1311 132 KV S/s Khatima – II 20.00 Dec-15Power Transmission Corporation of Uttarakhand Ltd. 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!