Klotz Associates Project No. 0972.000.000January 20104-9Caldwell County Regional Water and Wastewater Planning StudyFinal Report
the managed available groundwater. The groundwater permits that have beenapproved by PCCD are shown in Table 4-2. In addition to the listed permits inTable 4-2, PCCD received an application from the Plum Creek Group (preparedby Murfee Engineering Company) requesting 15,000 acre feet per year from the4,384 acres that PCCD annexed on March 25, 2008 in the Southeastern part ofCaldwell County.Type of PermitTABLE 4-2Plum Creek Conservation District Groundwater PermitsNameNumber ofWellsQuantity(acft/year)DatePermittedAgriculture- IrrigationPermits Joe Smith 2 400 2/21/06Agriculture- IrrigationPermits Brenda Horton 1 43 6/21/07Agriculture- IrrigationPermits Ben Tidwell 1 168 12/18/07Agriculture-Irrigation Permits Giacomel 1 22 9/12/07Agriculture-Irrigation Permits Joe Wells 1 31 6/2004Agriculture-Irrigation Permits Martin Pratka 1 43 9/12/06Agriculture-Irrigation Permits A.E. Nicholson 4 4,000 2/17/09Public Supply PermitsCity ofLockhart 7 5,475 7/15/08Public Supply Permits Dale WSC 1 269 6/17/08Public Supply Permits Polonia WSC 5 2,283 6/17/08*Public SupplyPermits Polonia WSC 1 1,343 -*Public Supply Permits Hazelette 1 200 -Public SupplyPermits Luling 4 1,612 8/19/08Public Supply Permits Aqua Water 3 625 11/20/07Total 16,514PCCD has established a Groundwater Management Plan & Protection Rules(adopted December 16, 2003) in effort to protect, preserve, enhance, and insurethe beneficial resources within its jurisdiction. A Groundwater Management Plan,which is a separate document, has also been prepared and was adopted in 2007 toKlotz Associates Project No. 0972.000.000January 20104-10Caldwell County Regional Water and Wastewater Planning StudyFinal Report
- Page 4 and 5: C O N S U L T I N G E N G I N E E R
- Page 6 and 7: C O N S U L T I N G E N G I N E E R
- Page 8 and 9: C O N S U L T I N G E N G I N E E R
- Page 10 and 11: C O N S U L T I N G E N G I N E E R
- Page 12 and 13: C O N S U L T I N G E N G I N E E R
- Page 14 and 15: C O N S U L T I N G E N G I N E E R
- Page 16 and 17: flows without impacting environment
- Page 18 and 19: viable for Caldwell County are wate
- Page 20 and 21: parameters and needs. For purposes
- Page 22 and 23: SECTION 1INTRODUCTION1.1 Background
- Page 24 and 25: A Grant Application for a Regional
- Page 26 and 27: 1.4 Participants and SponsorsThe Ca
- Page 28 and 29: SECTION 2CALDWELLL COUNTY CHARACTER
- Page 30 and 31: Construction for segments 5 and 6 o
- Page 32 and 33: Watershed and Peach Creek Watershed
- Page 34 and 35: 2.4 Certificates of Convenience and
- Page 36 and 37: Klotz Associates Project No. 0972.0
- Page 38 and 39: GRAPH 2-1Lockhart, Texas Monthly Av
- Page 40 and 41: Klotz Associates Project No. 0972.0
- Page 42 and 43: Klotz Associates Project No. 0972.0
- Page 44 and 45: water quality in the county. Finall
- Page 46 and 47: SECTION 4GROUNDWATER4.1 Groundwater
- Page 48 and 49: efore 1953. Deterioration in water
- Page 50 and 51: loose sand. The sand tends to be fr
- Page 52 and 53: 4.3 Groundwater Conservation Distri
- Page 56 and 57: support the efforts of PCCD. The di
- Page 58 and 59: SECTION 5SURFACE WATER5.1 GeneralSu
- Page 60 and 61: GRAPH 5-1Caldwell County Total Surf
- Page 62 and 63: GRAPH 5-2TWDB- Caldwell County Hist
- Page 64 and 65: SECTION 6POPULATION6.1 Population P
- Page 66 and 67: GRAPH 6-1TWDB Population Projection
- Page 68 and 69: GRAPH 6-3Texas State Data Center Po
- Page 70 and 71: TABLE 6-2Planning Study Population
- Page 72 and 73: Klotz Associates Project No. 0972.0
- Page 74 and 75: 7.1.2 City of LockhartThe City of L
- Page 76 and 77: Neiderwald. The service area in Cal
- Page 78 and 79: purchase capacity of 6.0 MGD. The a
- Page 80 and 81: Lockhart. The plant is capable of d
- Page 82 and 83: In 1994 GBRA began operating the Ci
- Page 84 and 85: 7.3.5 Sweetwater Utility, LLCSweetw
- Page 86 and 87: TABLE 8-1Caldwell County - TWDB His
- Page 88 and 89: Municipal water demand projections
- Page 90 and 91: applicable. A “P” in the Region
- Page 92 and 93: the modified TSDC Scenario 1.0, sho
- Page 94 and 95: GRAPH 8-3Caldwell County Survey Res
- Page 96 and 97: GRAPH 8-4Caldwell County Yearly Wat
- Page 98 and 99: espectively from the information pr
- Page 100 and 101: TABLE 9-6Caldwell County Projected
- Page 102 and 103: 10.3 United States Environmental Pr
Klotz Associates Project No. 0972.000.000January 20104-9Caldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyFinal Report