caldwell county regional water and wastewater planning study
caldwell county regional water and wastewater planning study caldwell county regional water and wastewater planning study
1.4 Participants and SponsorsThe Caldwell County Regional Water and Wastewater Planning study wassponsored by the following entities:Guadalupe Blanco-River AuthorityCaldwell CountyTexas Water Development BoardThe following individuals served as an Advisory Group to assist in guiding thestudy and providing feedback as the study progressed.Members:The Honorable H.T. Wright, County Judge, Caldwell County, TexasMr. Vance Rodgers, City Manager, City of Lockhart, TexasMr. Bobby Berger, City Manager, City of Luling, TexasMr. Johnie Halliburton, Executive Manager, Plum Creek ConservationDistrictMr. Bob Richards, Project Director, Cooper Land DevelopmentMs. Nikki Dictson, Extension Program Specialist, Texas AgriLifeExtension ServiceMr. Paul Pitman, Manager, Polonia Water Supply CorporationMs. Joyce Buckner, Community Representative for Lockhart, BluebonnetElectric CooperativeEx-Officio:Mr. Matt Nelson, Manager, Regional Water Planning, Texas WaterDevelopment BoardMs. Debbie Magin, Director of Water Quality Services, Guadalupe-Blanco River AuthorityThree Stakeholder Meetings were held as an important part of collecting data,receiving input from the community and developing solutions for regional watersupply, wastewater treatment, and non-point pollution controls.Klotz Associates Project No. 0972.000.000January 20101-5Caldwell County Regional Water and Wastewater Planning StudyFinal Report
The stakeholder meetings were held on the dates listed below and sign-in sheetsare included in Appendix A.Stakeholder Meeting 1: September 25, 2008Stakeholder Meeting 2: January 8, 2009Stakeholder Meeting 3: August 3, 2009 (Public Meeting)GBRA staff provided valuable oversight and assistance as the study progressedand their contribution is hereby acknowledged:Ms. Debbie Magin, Director of Water Quality Services, Guadalupe-Blanco River AuthorityMs. Liz Sedlacek, Administrative Assistant, Guadalupe-Blanco RiverAuthorityKlotz Associates Project No. 0972.000.000January 20101-6Caldwell County Regional Water and Wastewater Planning StudyFinal Report
- Page 1 and 2: CALDWELL COUNTY REGIONAL WATERAND W
- Page 4 and 5: C O N S U L T I N G E N G I N E E R
- Page 6 and 7: C O N S U L T I N G E N G I N E E R
- Page 8 and 9: C O N S U L T I N G E N G I N E E R
- Page 10 and 11: C O N S U L T I N G E N G I N E E R
- Page 12 and 13: C O N S U L T I N G E N G I N E E R
- Page 14 and 15: C O N S U L T I N G E N G I N E E R
- Page 16 and 17: flows without impacting environment
- Page 18 and 19: viable for Caldwell County are wate
- Page 20 and 21: parameters and needs. For purposes
- Page 22 and 23: SECTION 1INTRODUCTION1.1 Background
- Page 24 and 25: A Grant Application for a Regional
- Page 28 and 29: SECTION 2CALDWELLL COUNTY CHARACTER
- Page 30 and 31: Construction for segments 5 and 6 o
- Page 32 and 33: Watershed and Peach Creek Watershed
- Page 34 and 35: 2.4 Certificates of Convenience and
- Page 36 and 37: Klotz Associates Project No. 0972.0
- Page 38 and 39: GRAPH 2-1Lockhart, Texas Monthly Av
- Page 40 and 41: Klotz Associates Project No. 0972.0
- Page 42 and 43: Klotz Associates Project No. 0972.0
- Page 44 and 45: water quality in the county. Finall
- Page 46 and 47: SECTION 4GROUNDWATER4.1 Groundwater
- Page 48 and 49: efore 1953. Deterioration in water
- Page 50 and 51: loose sand. The sand tends to be fr
- Page 52 and 53: 4.3 Groundwater Conservation Distri
- Page 54 and 55: Klotz Associates Project No. 0972.0
- Page 56 and 57: support the efforts of PCCD. The di
- Page 58 and 59: SECTION 5SURFACE WATER5.1 GeneralSu
- Page 60 and 61: GRAPH 5-1Caldwell County Total Surf
- Page 62 and 63: GRAPH 5-2TWDB- Caldwell County Hist
- Page 64 and 65: SECTION 6POPULATION6.1 Population P
- Page 66 and 67: GRAPH 6-1TWDB Population Projection
- Page 68 and 69: GRAPH 6-3Texas State Data Center Po
- Page 70 and 71: TABLE 6-2Planning Study Population
- Page 72 and 73: Klotz Associates Project No. 0972.0
- Page 74 and 75: 7.1.2 City of LockhartThe City of L
The stakeholder meetings were held on the dates listed below <strong>and</strong> sign-in sheetsare included in Appendix A.Stakeholder Meeting 1: September 25, 2008Stakeholder Meeting 2: January 8, 2009Stakeholder Meeting 3: August 3, 2009 (Public Meeting)GBRA staff provided valuable oversight <strong>and</strong> assistance as the <strong>study</strong> progressed<strong>and</strong> their contribution is hereby acknowledged:Ms. Debbie Magin, Director of Water Quality Services, Guadalupe-Blanco River AuthorityMs. Liz Sedlacek, Administrative Assistant, Guadalupe-Blanco RiverAuthorityKlotz Associates Project No. 0972.000.000January 20101-6Caldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyFinal Report