10.07.2015 Views

caldwell county regional water and wastewater planning study

caldwell county regional water and wastewater planning study

caldwell county regional water and wastewater planning study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX MCaldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyRegional Water PlanningWater Transmission Line OptionsPrepared June 2009PROJECT COST SUMMARY WITH 12" DISTRIBUTION SYSTEMITEM NO.ITEM DESCRIPTIONAMOUNT1 Line 1A - Ground<strong>water</strong> Source Route to Lockhart$33,800,0002 Line 1B - Ground<strong>water</strong> Source Route to Luling$30,200,0003 Line 1C - Surface Water Source Route to Luling$51,300,0004 Line 2 - SH 130 North Route$10,221,1285 Line 3 - Northwest Route to Uhl<strong>and</strong>$6,282,9226 Line 4 - SH 130 West$8,608,917Level of Cost Projection: The engineer has no control over the cost of labor, materials, or equipment, or over the Contractor’s methods ofdetermining prices, or over competitive bidding or market conditions. As a result, this opinion of probable constructioncost is based on thePage 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!