flows without impacting environment
- Page 18 and 19:
viable for Caldwell County are wate
- Page 20 and 21:
parameters and needs. For purposes
- Page 22 and 23:
SECTION 1INTRODUCTION1.1 Background
- Page 24 and 25:
A Grant Application for a Regional
- Page 26 and 27:
1.4 Participants and SponsorsThe Ca
- Page 28 and 29:
SECTION 2CALDWELLL COUNTY CHARACTER
- Page 30 and 31:
Construction for segments 5 and 6 o
- Page 32 and 33:
Watershed and Peach Creek Watershed
- Page 34 and 35:
2.4 Certificates of Convenience and
- Page 36 and 37:
Klotz Associates Project No. 0972.0
- Page 38 and 39:
GRAPH 2-1Lockhart, Texas Monthly Av
- Page 40 and 41:
Klotz Associates Project No. 0972.0
- Page 42 and 43:
Klotz Associates Project No. 0972.0
- Page 44 and 45:
water quality in the county. Finall
- Page 46 and 47:
SECTION 4GROUNDWATER4.1 Groundwater
- Page 48 and 49:
efore 1953. Deterioration in water
- Page 50 and 51:
loose sand. The sand tends to be fr
- Page 52 and 53:
4.3 Groundwater Conservation Distri
- Page 54 and 55:
Klotz Associates Project No. 0972.0
- Page 56 and 57:
support the efforts of PCCD. The di
- Page 58 and 59:
SECTION 5SURFACE WATER5.1 GeneralSu
- Page 60 and 61:
GRAPH 5-1Caldwell County Total Surf
- Page 62 and 63:
GRAPH 5-2TWDB- Caldwell County Hist
- Page 64 and 65:
SECTION 6POPULATION6.1 Population P
- Page 66 and 67:
GRAPH 6-1TWDB Population Projection
- Page 68 and 69:
GRAPH 6-3Texas State Data Center Po
- Page 70 and 71:
TABLE 6-2Planning Study Population
- Page 72 and 73:
Klotz Associates Project No. 0972.0
- Page 74 and 75:
7.1.2 City of LockhartThe City of L
- Page 76 and 77:
Neiderwald. The service area in Cal
- Page 78 and 79:
purchase capacity of 6.0 MGD. The a
- Page 80 and 81:
Lockhart. The plant is capable of d
- Page 82 and 83:
In 1994 GBRA began operating the Ci
- Page 84 and 85:
7.3.5 Sweetwater Utility, LLCSweetw
- Page 86 and 87:
TABLE 8-1Caldwell County - TWDB His
- Page 88 and 89:
Municipal water demand projections
- Page 90 and 91:
applicable. A “P” in the Region
- Page 92 and 93:
the modified TSDC Scenario 1.0, sho
- Page 94 and 95:
GRAPH 8-3Caldwell County Survey Res
- Page 96 and 97:
GRAPH 8-4Caldwell County Yearly Wat
- Page 98 and 99:
espectively from the information pr
- Page 100 and 101:
TABLE 9-6Caldwell County Projected
- Page 102 and 103:
10.3 United States Environmental Pr
- Page 104 and 105:
10.4.3 Source Water ProtectionSourc
- Page 106 and 107:
10.6.1 E.coli PotentialIt is estima
- Page 108 and 109:
TABLE 10-4Estimated Loadings from U
- Page 110 and 111:
Klotz Associates Project No. 0972.0
- Page 112 and 113:
The proposed GBRA Mid-Basin Project
- Page 114 and 115:
11.1.3 Lower Guadalupe Water Supply
- Page 116 and 117:
the maximum available groundwater f
- Page 118 and 119:
An ASR is a viable solution. Ground
- Page 120 and 121:
The water conservation strategy is
- Page 122 and 123:
SECTION 12REGIONAL WATER PLANNING12
- Page 124 and 125:
TABLE 12-2Caldwell County Water Sup
- Page 126 and 127:
Klotz Associates Project No. 0972.0
- Page 128 and 129:
12.3.2 DistributionThe water will b
- Page 130 and 131: 12.4 Water System Cost EstimatesVar
- Page 132 and 133: 300272GRAPH 13-1Caldwell County OSS
- Page 134 and 135: Klotz Associates Project No. 0972.0
- Page 136 and 137: 2. The Martindale Regional Facility
- Page 138 and 139: decentralized system providing sewe
- Page 140 and 141: Unfortunately, the simplicity of O&
- Page 142 and 143: associated costs. Efficient and fun
- Page 144 and 145: Klotz Associates Project No. 0972.0
- Page 146 and 147: 14.3 Water Quality Concerns and Sou
- Page 148 and 149: wastewater plant return flows. The
- Page 150 and 151: 14.6 Recommended Load ReductionsLoa
- Page 152 and 153: 14.7.2 Water Quality Development Or
- Page 154 and 155: 14.8.3 Vegetative Filter StripsVege
- Page 156 and 157: Use constructed wetlands to capture
- Page 158 and 159: 14.12 Implementation Recommendation
- Page 160 and 161: Type II reclaimed water is defined
- Page 162 and 163: Pollutant loading to streams from e
- Page 164 and 165: Future growth in Caldwell County wi
- Page 166 and 167: 14.12.4 OSSF Annual Inspection and
- Page 168 and 169: Water Quality Monitoring Program -
- Page 170 and 171: execute strategies. Local, state, a
- Page 172 and 173: the environment. Funding for the pr
- Page 174 and 175: the watershed organizations should
- Page 176 and 177: water or groundwater to meet future
- Page 178 and 179: Mid-Basin Project and associated fa
- Page 190 and 191: C O N S U L T I N G E N G I N E E R
- Page 192 and 193: APPENDIX B/012234 ! &# ! %
- Page 194 and 195: APPENDIX B#$ # 4(0 A
- Page 196 and 197: APPENDIX B # !6 . 0.# # / %
- Page 198 and 199: APPENDIX B # ;4
- Page 200 and 201: APPENDIX B 4 4)# #. ,
- Page 202 and 203: APPENDIX CThe following tables are
- Page 204 and 205: Texas Water Development BoardGround
- Page 206 and 207: State WellNumber6703713670371567037
- Page 208 and 209: State WellNumber6704503670450467045
- Page 210 and 211: State WellNumber6711105671120267112
- Page 212 and 213: State WellNumber6712112671211367121
- Page 214 and 215: State WellNumber6712518671251967125
- Page 216 and 217: State WellNumber6719302671930467193
- Page 218 and 219: State WellNumber6720102672010467201
- Page 220 and 221: C O N S U L T I N G E N G I N E E R
- Page 222 and 223: APPENDIX E4. Flow Between Aquifers
- Page 224 and 225: APPENDIX ESection 8.2 describes the
- Page 226 and 227: APPENDIX EReductions in the allowab
- Page 228 and 229: C O N S U L T I N G E N G I N E E R
- Page 230 and 231:
CALDWELL COUNTYYear Basin Municipal
- Page 232 and 233:
CALDWELL COUNTYYear Source Municipa
- Page 234 and 235:
Data Dictionary - Water Rights Data
- Page 236 and 237:
RegionCodeIndicates the Regional Wa
- Page 238 and 239:
WRNoWRTypeWRSeqAPPENDIX GTCEQ SURFA
- Page 240 and 241:
C O N S U L T I N G E N G I N E E R
- Page 242 and 243:
APPENDIX HAnnual presentationsConse
- Page 244 and 245:
APPENDIX Hbeneficial to test every
- Page 246 and 247:
APPENDIX Hand ways in which the sta
- Page 248 and 249:
APPENDIX IBEST MANAGEMENT PRACTICES
- Page 250 and 251:
APPENDIX I• Filter Strips: Establ
- Page 252 and 253:
Management Measuresas described in
- Page 254 and 255:
Outreach Activitiesas described in
- Page 256 and 257:
C O N S U L T I N G E N G I N E E R
- Page 258 and 259:
APPENDIX Kbe operated by a public r
- Page 264 and 265:
RESPONSE TO WRITTEN COMMENT BY GRAH
- Page 266 and 267:
C O N S U L T I N G E N G I N E E R
- Page 268 and 269:
APPENDIX MCaldwell County Regional
- Page 270 and 271:
APPENDIX MCaldwell County Regional
- Page 272 and 273:
APPENDIX MCaldwell County Regional
- Page 274 and 275:
APPENDIX MPopulation ProjectionsWas
- Page 276 and 277:
C O N S U L T I N G E N G I N E E R
- Page 281 and 282:
APPENDIX NKLOTZ ASSOCIATES RESPONSE
- Page 283 and 284:
APPENDIX NKlotz Associates Response
- Page 285 and 286:
C O N S U L T I N G E N G I N E E R